-
RB 77/00084;Amdel 01174 SADM/Amdel Project no. 1/1/198. Mintaro slate.
Late in 1976, the Mintaro Slate and Flagstone Company approached the South Australian Department of Mines seeking assistance to enable it to improve the efficiency of its operation and so enable it to operate more profitably in the face of competition...-
Document
Published: 01 Jul 1977
-
Leighton. Annual and final reports to licence surrender for the period 19/11/2007 to 21/8/2009.
Basal Umberatana Group glacial tillitic sedimentary sequences and upper Burra Group interglacial arenaceous sediments were explored for possible economic stratabound gold mineralisation in an area located about 10-40 km north-west of Burra. In the...-
Document
-
RB 62/00028 Report on geochemical investigation, Burra project.
The pedological environment of the Burra area is described, the methods of soil sampling and sample penetration are given in detail and an outline of the spectrographic analytical procedure is given. Attempts at applying statistical methods to the...-
Document
Published: 02 Feb 1966
-
Mount Bryan. Annual report and final report to licence full surrender, for the period 21/1/2008 to 7/5/2012.
Exploration for gold and copper mineralisation within an area located immediately south of Mount Bryan and 19 km north of Burra was aimed principally at finding deposits of copper oxide and carbonate ores similar to those mined historically at Burra...-
Document