-
RB 92/00045 Upper South-East dryland salinity and flood management plan. Excavation characteristics and slope design for the drainage channels.
The Upper South-East Dryland Salinity and Flood Management Plan proposals aim to address the worsening salinisation problems now clearly visible in the area. This report provides feasibility and preliminary project design data to the EWS engineers who...-
Document
Published: 01 Sep 1992
-
RB 00811 Redcliff Project: geological setting and preliminary assessment of environmental factors.
This report has been compiled at the request of the Redcliff Steering Committee to assist in the preparation of an Environmental Impact Statement. It relies almost entirely on work carried out by Departmental officers and private consultants during...-
Document
-
RB 75/00064 Monarto City Centre. Geotechnical investigations report no. 1.
Engineering investigations at the Monarto City Centre consisted of 8 diamond drill holes up to 15m deep, 25 backhoe test pits, detailed mapping and seismic refraction surveys. The area consists of Kanmantoo Group meta-sediments, in part overlain by a...-
Document
Published: 01 Jan 1975
-
RB 74/00111 Amphibolite deposit near Tailem Bend.
Railway ballast was sought from amphibolite of the Kanmantoo Group of Cambrian age which subcrops on a bedrock ridge in the Murray Basin near Tailem Bend. A surface sample of amphibolite returned low Los Angelese Abrasion and Sodium Sulphate Soundness...-
Document
Published: 01 Jan 1977