RB 92/00045 Upper South-East dryland salinity and flood management plan. Excavation characteristics and slope design for the drainage channels.
The Upper South-East Dryland Salinity and Flood Management Plan proposals aim to address the worsening salinisation problems now clearly visible in the area. This report provides feasibility and preliminary project design data to the EWS engineers who...-
Document
Published: 01 Sep 1992
-
RB 76/00008 Monarto new town. Proposed city centre. Geotechnical investigations report no. 2.
Engineering geological investigations consisting of cable tool drilling of 10 holes up to 15.25m deep, penetration testing and seismic refraction surveys were completed at the proposed CBD of the Monarto city centre. Drilling encountered thin...-
Document
Published: 02 Feb 1976