Archaean Metabasic Diamond Drilling Project.
The Archaean Metabasic Diamond Drilling Project was undertaken by SADME Regional Geology Branch (part of the Geological Survey of South Australia) in two locations within the north-western Gawler Craton. Metasediments in this region include banded...-
Document
-
Wynbring [Siding]. Data release made in lieu of submitting a first partial surrender report upon licence expiry/renewal : annual reports for the period 30/8/2004 to 29/8/2009.
An area located approximately 160 km north-northwest of Ceduna is being explored for possible economic nickel-copper-platinum group metal magmatic mineral deposits, which may have formed within Archaean to Proterozoic basement rocks in a geological...-
Document
-
Carnding. Data release made in lieu of submitting a second partial relinquishment report at licence expiry/renewal : progress reports and annual reports for the period 29/9/1994 to 16/1/2005.
Renewed brownfields gold exploration in an area situated 20-40 km north and west of the Tarcoola Goldfield, previously held in part by the licensee as EL 1848, was prompted by the May 1995 success of the Samantha/Resolute/Dominion corporate joint...-
Document
Published: 28 Jul 1905
-
Gawler Project Central Tenement Block [Part]. Data release at licences' joint partial surrender: Southern Gold gold exploration JV - specific annual reports 6/2/2006 to 30/6/2009. [Index Part 2 of 2].
After the Southern Gold joint venture agreement was signed in February 2006, that company as JV operator performed a due diligence review of Dominion Mining's exploration data, did some orientation soil calcrete and biogeochemical sampling at Typhoon...-
Document
Published: 02 Feb 1910
-
Cedric Bore. Annual reports plus final report to licence expiry/full surrender, for the period 2/4/2002 to 17/6/2008.
An area centred ~ 80 km north of Tarcoola was taken under licence to explore for possible economic buried precious and base metallic mineralisation hosted by Archaean and Proterozoic basement rocks. The area was selected on the basis of it having...-
Document
Published: 16 Sep 1908
-
Bulgunnia Station (part of the Titan Base-Precious Metals Project). First annual report, plus final report to licence full surrender, for the period 10/4/2015 to 18/10/2016.
An area centred ~120 km south-west of Coober Pedy has been explored for possible economic buried gold and base metals mineralisation that may have formed within Proterozoic and older basement rocks. Mostly these are covered by the younger Jurassic...-
Document
Published: 15 Nov 1916
-
Coober Pedy Project. Annual reports, joint annual reports, and final reports at individual licences' full surrender, for the period 4/4/2011 to 3/4/2015.
Five separate areas located in the northern Gawler Craton adjacent to the Mount Woods Domain, which to date have received only minor attention from mineral explorers and so have had limited drilling done, have been explored for possible buried...-
Document
Published: 15 Apr 1915
-
Wilkinson Lakes East. Annual reports plus final report to licence full surrender, for the period 3/5/2010 to 6/2/2015.
An area centred ~150 km west of Coober Pedy, that is located mostly north-west of and that also has a small part lying immediately south-east of the Karari Fault, a major crustal structure which has controlled deposition at the southern limit of the...-
Document
-
Kingoonya. Annual reports and final report to licence full surrender, for the period 27/11/2006 to 21/4/2015.
An area surrounding the township of Kingoonya and straddling the Trans Australia Railway line, that comprises six tenement sub-blocks,has been explored for possible economic occurrences of buried Tertiary roll-front style secondary uranium...-
Document
Published: 23 Apr 1915
-
Data release - as updated : Lake Woorong. Annual reports to licence expiry/full surrender, for the period 8/6/2012 to 7/6/2019.
A large area centred ~80 km south-west of Coober Pedy has been explored for possible buried economic iron ore, including inferred DSO haematite mineralisation, and for base metal massive sulphide deposits that may have formed in Proterozoic basement...-
Document
Published: 30 Jul 1919
-
Commonwealth Hill Station - Central (part of the Commonwealth Hill Project). Second partial surrender report, for the period 11/5/2007 to 10/5/2017.
Six separate portions of the subject licence, with a combined total area of 35 square km, have been surrendered due to their now perceived diminished prospectivity for iron ore, gold, uranium, PGEs and base metals. During the period of their tenure,...-
Document
Published: 04 Dec 1917
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 4 partnership no. DPY4-07, Mirikata mineral prospects. Project final report.
The Mirikata EL 3537 joint venture partners, Newcrest Operations Ltd and PlatSearch NL, have completed a planned four hole drilling campaign over three separate magnetic and/or gravity anomalies located 30-40 km west-southwest of Prominent Hill on...-
Document
-
Barton West and Barton East (initially part of the Gawler Joint Venture Project). Data release made in lieu of submitting a third partial surrender report for the latter licence : joint annual reports for the period 14/3/2001 to 11/1/2011.
The trigger event causing this data release to be made is that three portions of licence ground that together cover ~289 square km or 19.5% of the former area of EL 4217 Barton East have now been relinquished, as of 11/1/2011. No corresponding partial...-
Document
Published: 09 Mar 1911
-
Little Mount Finke. First annual report plus final report to licence full surrender, for the period 21/2/2011 to 10/10/2012.
An area centred about 40 km south-west of Tarcoola has been explored for possible economic copper-gold mineralisation in Archaean to Proterozoic basement rocks, which may be associated with a series of intense magnetic features evident in 200 m line...-
Document
Published: 26 Sep 1912
-
Data release - as updated [made at SA Director of Mines’ discretion] : Carnding. Annual reports for the period 5/7/2009 to 27/3/2019.
As part of Stellar Resources' regional gold exploration programme, aircore drilling along six north-south traverses crossing the Bulgunnia Shear Zone was undertaken during July-August 2009 (data pertaining to this programme was not reported in the...-
Document
Published: 27 Mar 1919
-
Carne Outstation (part of the Commonwealth Hill Project). Annual reports to licence full surrender, for the period 10/10/2013 to 18/8/2016.
A very small area centred ~60 km north of Tarcoola has been explored for possible economic buried iron ore, gold, uranium, PGEs and base metals. The licensee's exploration attention here was directed primarily at possible buried IOCG and other style...-
Document
Published: 02 Aug 1916
-
Garford [Outstation], Indooroopilly Outstation and Half Moon Lake (the Challenger West Project). Joint annual reports and joint final report to licences' respective expiry/full surrender, for the period 30/4/2003 to 13/10/2010.
The three licences comprising the Challenger West Project were taken up principally to explore for economic gold, which could possibly occur in strike extensions of known gold lodes formed within Archaean basement rocks that constitute the Challenger...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Carnding. Annual reports to licence expiry/renewal, for the period 5/7/2005 to 4/7/2009.
EL 3369 is located in the central Gawler Craton, and is centred approximately 35 km west and west-northwest of Tarcoola. The licence area consists of two geographically separate [by ~5 km] blocks – exploration activity in the eastern block has...-
Document
-
Data release - as updated : Muckanippie. Annual reports to licence expiry/full surrender, for the period 20/10/2005 to 23/2/2019.
EL 3438 Muckanippie is located in the northern Gawler Craton, on the western margin of the Gawler Range Volcanics Domain, and is centred approximately 60 km north-west of Tarcoola. Basement outcrop on the licence area is sparse, with a thin cover of...-
Document
Published: 25 Feb 1919
-
Data release - as updated [made at SA Director of Mines' discretion] : Painted Hill, Birthday Hill, White Hill, Mount Hawker, The Twins and Balta Baltana (the Mount Woods Project). Joint annual reports for the period 1/1/2011 to 31/12/2018.
Exploration activities undertaken on the Mount Woods Project during 2011 comprised: - ongoing target generation and geological interpretation - continued geological and structural interpretation of the Mount Woods Inlier - drilling of 80 rotary...-
Document
Published: 28 Feb 1919