-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-01, north-western Eyre Peninsula (eastern Eucla Basin) heavy mineral sands prospects. Project final report.
As a result of PACE Initiative - subsidised regional exploratory drilling for Tertiary heavy mineral sands carried out on the north-western Eyre Peninsula during February-April 2006, comprising 349 aircore drillholes put down along 19 traverses for a...-
Document
Published: 08 Jun 1906
-
Thurlga Ramp (part of the Eyre Peninsula Project, Corrobinnie Uranium JV and Thurlga JV periods). Data release : final report at licence expiry/full surrender, for the period 1/1/2013 to 3/5/2019.
During the report period, licensee Andromeda Metals did no on-ground exploration. During its agreed 3-year earn-in period, joint venturer Investigator Resources undertook the following work described herein: - acquisition of high resolution aerial...-
Document
Published: 19 Jul 1919
-
Data release - as updated : Warrior. Annual reports to licence expiry/full surrender, for the period 8/7/2005 to 20/9/2017.
An area centred approximately 50 km west-northwest of Tarcoola was taken up to explore for possible economic Tertiary palaeochannel-hosted roll front type sedimentary uranium mineralisation. EL 3372 contains the Warrior Palaeochannel, a tributary of...-
Document
Published: 27 Nov 1917
-
RB 2022/00011 Eucla Basin and peripheral paleovalleys.
The Cenozoic Eucla Basin is located on the southern margin of the Australian continent, with a present-day basin onshore edge which extends for over 2,000 km from Western Australia into South Australia. The basin’s sediment fill comprises a thin...-
Document
Published: 01 Nov 2022