-
The MIM-Peko Stuart Shelf Joint Venture Project. Progress reports to licences' joint full surrender and their re-issue as a single replacement tenement, for the period 15/2/1983 to 20/10/1989.
Exploration for Olympic Dam-style Cu-Au-U mineralisation, undertaken over areas to the south-east of Arcoona Homestead and in the vicinity of Woomera township, has comprised numerous reconnaissance and then detailed gravity, ground magnetic and CSAMT...-
Document
-
Pyramid Bore. Annual reports and final report to licence full surrender, for the period 8/7/2005 to 5/1/2010.
An area located approximately 10 km north of Glendambo has been explored for possible economic buried uranium deposits which might be indicated by aerial radiometric anomalies associated with playa lakes in the region, since these latter mark zones of...-
Document
Published: 20 May 1910
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1994 to 17/10/2008 [ Index Part 3 of 4 ].
During the eighth year of tenure, work done on EL 2639 included: - the conduct of infill ground gravity and CSAMT surveys; - geophysical modelling and interpretation of the new survey data; - geological interpretation and refinement of drilling...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1998 to 17/10/2008 [ Index Part 2 of 4 ].
Stuart Metals is primarily exploring EL 1946 for stratiform copper mineralisation of the various styles known to be present in the Mount Gunson district. In addition, the company regards the largely unknown Mesoproterozoic basement to have strong...-
Document
-
Billa Kalina Homestead. Progress reports and final report to licence full surrender, for the period 30/6/1977 to 14/2/1979.
Airborne and ground geophysical surveys were undertaken in the Billa Kalina area, prior to commencing to drill in a search for Olympic Dam type Cu-U-Au mineralised haematitic breccias, in order to delineate and detail several broad magnetic anomalies...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 6 partnership DPY6-02, evaluation of the Vulcan IOCGU mineralised system. Project final report.
Tasman Resources has discovered a new potential iron oxide - associated copper-gold-uranium (IOCGU) ore deposit at the Vulcan prospect, located 30 km north-northeast of Olympic Dam. The prospectivity of the Mesoproterozoic basement rocks in this...-
Document
Published: 28 Sep 1910
-
Data release [made at SA Director of Mines' discretion] : Stuart Shelf. Progress reports, annual reports and final report to licence renewal / re-issue, for the period 17/6/1986 to 15/9/1996.
On 21/11/1986, Western Mining Corp. (WMC) signed a joint venture agreement with PNC Exploration (Australia) Pty Ltd [a subsidiary of the Power and Nuclear Fuels Corp. of Japan], whereby PNC can earn up to 25% equity in EL 1338 by funding exploration...-
Document
-
Data release [made at SA Director of Mines' discretion] : Andamooka (part of the Stuart Shelf Project). Progress reports to licence expiry/renewal, for the period 2/5/1975 to 1/5/1977. [ Index Part 1 of 2 ].
An inaugural exploration licence covering land in the Roxby Downs Station and Andamooka Station holdings was taken up by Western Mining Corp. (WMC) to document the stratigraphic section present in the northern portion of the Stuart Shelf tectonic...-
Document
-
Beddome Dams. Progress reports to licence surrender for the period 28/7/1980 to 3/8/1983.
Ground magnetic and regional infill and detailed gravity surveys, plus Maxi-Probe ground EM soundings, were carried out on two grids laid out near Beddome Hill, which lies 35 km west of Roxby Downs Homestead, to investigate a 4-6 mGal regional gravity...-
Document
Published: 28 Sep 1983
-
Roxby Downs West. Annual reports and final report to licence full surrender, for the period 20/10/2005 to 13/5/2009.
EL 3428, located 17 km south-west of the Olympic Dam deposit and 5 km south of the Acropolis prospect, was taken up by Uranium Exploration Australia (UXA) primarily to explore for copper-uranium-gold-silver-rare earth element (Cu-Au-U-REE+/-Ag)...-
Document
Published: 05 Jun 1909
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1994 to 14/7/1998 [ Index Part 1 of 4 ].
An area of open ground encompassing the historic Mount Gunson mining district on the Stuart Shelf and three existing mining leases was taken up by David Clarke to explore for possible economic copper-cobalt mineralisation and any other precious or...-
Document
-
Lake Labyrinth (part of the Gawler and the Labyrinth Joint Venture Projects). Data release at second partial relinquishment : project licences' combined annual reports for the period 27/8/1999 to 28/9/2008.
In a continuation of exploration for economic deposits of gold and base metal mineralisation in the Lake Labyrith area, joint venture operator MIM Exploration carried out a proprietary 'MIMDAS' geophysical survey (utilising combined dipole-dipole IP...-
Document
Published: 18 Mar 1909