-
The MIM-Peko Stuart Shelf Joint Venture Project. Progress reports to licences' joint full surrender and their re-issue as a single replacement tenement, for the period 15/2/1983 to 20/10/1989.
Exploration for Olympic Dam-style Cu-Au-U mineralisation, undertaken over areas to the south-east of Arcoona Homestead and in the vicinity of Woomera township, has comprised numerous reconnaissance and then detailed gravity, ground magnetic and CSAMT...-
Document
-
RB 92/00037 Review of mineral exploration, KINGOONYA 1:250 000 map area.
This report was prepared as a summary of all open file mineral exploration data from the KINGOONYA 1:250000 mapsheet area that are held in the SADME records management Envelope system. The aim of the holdings review was to describe past exploration,...-
Document
Published: 29 Nov 1991
-
South Vivian [Homestead]. Annual reports and final report to licence expiry/full surrender, for the period 12/6/2007 to 11/6/2009.
An area located on the northern Stuart Shelf between Olympic Dam and Prominent Hill, approx. 50 km south-southwest of the latter, has been explored for possible Olympic Dam type iron oxide - associated copper-gold (IOCG) deposits and for Canadian...-
Document
Published: 17 Oct 1909
-
Mulga Well Outstation. First partial surrender report at licence expiry/renewal, for the period 22/6/2004 to 21/6/2009.
Soil and calcrete geochemical data is presented for the now relinquished portions of EL 3211.-
Document
Published: 09 Sep 1909
-
Coondambo. Second partial surrender report, for the period 7/6/2001 to 6/6/2009.
As part of a search for possible buried economic Olympic Dam type IOCG-U deposits in volcanic basement, or for stratiform Athabasca Basin type uranium occurrences in the overlying cover, farminee Marathon Resources carried out detailed calcrete...-
Document
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 1 partnership no. DPY1-12, Chianti mineral prospect. Project final report.
The subject report describes the results of drilling two fully cored rotary holes totalling 1161.10 m at the Chianti prospect, an unusually-shaped residual gravity anomaly located in Gunson Resources' EL 3264, 20 km north-east of the Mount Gunson...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-13, evaluation of the Marathon South mineral occurrence. Project interim and final reports.
Following further detailed ground gravity surveying and data processing carried out to better understand the gravity response of relatively dense and weakly magnetic basement rocks at the Marathon South prospect, located within EL 3209 and lying...-
Document
Published: 10 May 1906
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-04, Churchill Dam area iron oxide - associated copper-gold and uranium mineral prospect. Project interim and final reports.
EL 3511 licensee Debnal and its joint venture partner Venture Minerals are exploring an area of the eastern Gawler Craton having a predicted high potential for the discovery of Olympic Dam type iron oxide - associated copper-gold-uranium (IOCG-U)...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 4 partnership DPY4-56, northern Olympic Domain: Sloane Hill silver and IOCG mineral prospect. Project final report.
A PACE Initiative Year 4 subsidised drilling project carried out on Mount Eba Station, in an area located approximately 30 km south of the Prominent Hill mine, initially targeted a wide above background silver geochemical anomaly returned by sampling...-
Document
Published: 18 Dec 1907
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 4 partnership no. DPY4-65, Chianti mineral prospect. Project completion dataset.
The subject set of reports describes the results of PACE Initiative Year 4 partly-subsidised drilling work conducted in the vicinity of the Chianti prospect, which lies approx. 20 km north of the old Mount Gunson mining camp. The aim of this work,...-
Document
-
Partridge Range (part of the Gibraltar Joint Venture Project). Annual reports and final report to licence full surrender, for the period 4/3/1997 to 3/12/2008.
Exploration of an area with poor basement outcrop, located approximately 45 km north-east of Tarcoola, primarily sought possible fault or breccia-hosted mesothermal gold +/- base metal mineralisation in likely multiphase Mesoproterozoic felsic...-
Document
Published: 12 Aug 1908
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-07 - northern Gawler Craton - Welbourn Hill and Nicholson Hill magnetic/gravity anomalies IOCG-U mineral prospects. Project final report.
As part of a search for possible high crustal level, Olympic Dam - type IOCG deposits hosted by Mesoproterozoic basement rocks, Eromanga Uranium undertook deep diamond drill testing of two large, semi-coincident magnetic/gravity anomalies recognised...-
Document
-
Mount Eba. Annual reports and final report to licence expiry/full surrender, for the period 20/10/2005 to 19/10/2008.
An area within the northern Stuart Shelf which extends from 15 to 65 km south of the Prominent Hill mine site has been explored for possible similar IOCG-U type economic mineral deposits by a new industry entrant uranium explorer, Uranium Exploration...-
Document
Published: 16 Jan 1909
-
Gosse and Kingoonya (part of the Mentor Project, and later the Kingoonya Project). Data release made at joint partial relinquishment upon licences' expiry/renewal: annual reports for the period 3/12/1997 to 28/9/2008. [Index Part 2 of 2].
In continuing exploration carried out by Mount Isa Mines Exploration (MIM) during 1998 on EL 1792 / 2467 Gosse and EL 1798 / 2466 Kingoonya, additional calcrete sampling and RC drilling (25 holes for 1590 m total penetration) took place at four...-
Document
-
Pyramid Bore. Annual reports and final report to licence full surrender, for the period 8/7/2005 to 5/1/2010.
An area located approximately 10 km north of Glendambo has been explored for possible economic buried uranium deposits which might be indicated by aerial radiometric anomalies associated with playa lakes in the region, since these latter mark zones of...-
Document
Published: 20 May 1910
-
Bulgunnia, Gosse and Kingoonya (the Mentor Project). Data release made at the surrender of subsequent licences : annual reports for the period 27/10/1992 to 15/11/1997. [Index entry Part 1 of 2 - a very long abstract is split between these two parts].
The Gawler Joint Venture partners (Dominion Mining and Resolute Resources) have been exploring three near-contiguous areas located in the north of the Tarcoola - Kingoonya district, seeking possible economic concealed epithermal/mesothermal...-
Document
-
Data release [made at SA Director of Mines' discretion] : Yeltacowie (part of the Mount Gunson Project). Annual reports for the period 30/7/2003 to 6/10/2009.
The subject EL 3112 ground represents the continuation of tenure by Gunson Resources, over the same area, from its former EL 2516 Yeltacowie (for which see the relevant licence reports previously released in Envs 9530 and 9715). This replacement...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Hawks Nest. Annual reports to licence expiry/renewal, for the period 12/3/1999 to 11/3/2004.
An area comprising two separate sub-blocks centred ~115 km south-southeast of Coober Pedy and located to the west of the Stuart Highway is being explored for Archaean to Palaeoproterozoic banded iron formation iron ore mineralisation of economic...-
Document
Published: 05 Feb 1904
-
Data release - as updated : McDouall Peak. Annual reports and final report to licence expiry/full surrender, for the period 8/10/2007 to 7/10/2022.
Quasar Resources has been exploring a large licence area centred approximately 40 km south-west of the Prominent Hill mine for possible economic buried iron-oxide-copper-gold (IOCG) style mineralisation, epithermal base metal mineralisation of the...-
Document
Published: 27 Oct 1922
-
The Lake Torrens Project; plus the Olympic Domain Project. Joint annual reports for the period 1/1/2006 to 31/12/2010.
Licensee Copper Range originally took up a group of three tenements located in central South Australia covering areas within and west of Lake Torrens, with the intent, much reinforced following the Carrapateena deposit discovery made in 2005, of...-
Document
Published: 04 Mar 1911