-
RB 79/00017 Completion report irrigation well for D.J. and N.P. Mount, secn 11 Hd Kingsford, Co. Chandos.
The well has been drilled into an area of low salinity groundwater occurring within the Tertiary limestone aquifer at Karte, north-west of Pinnaroo. A 48-hour well test was carried out at an average pumping rate of 2600 m3/day (23,800 gals/hr), and...-
Document
Published: 01 Jan 1979
-
RB 77/00132 Hydrogeology of the Paragum Depression, Monarto SA.
Cable tool and rotary drilling of 8 holes has enabled the geological sequence and general hydrology to be determined in the area to appraise its potential as a disposal site for stormwater runoff from urbanised Monarto.-
Document
Published: 01 Jan 1977
-
RB 95/00022 Five year technical review, 1991-1995 - Border (Groundwater Agreement) Act, 1985.
The Groundwater (Border Agreement) Act of 1985 legislated to provide a framework for the joint management of groundwater resources within a 40 km wide strip along the length of the South Australian and Victorian Border, which is referred to as the...-
Document
Published: 01 Jun 1995
-
RB 91/00009 Border Groundwater Agreement five-year groundwater resource assessment review, 1986-1990. Report.
South Australian investigations have concentrated on defining the nature of the Tertiary limestone aquifer and determining aquifer recharge rates in Zones 3A-7A, to enable a reassessment of groundwater resources for Zones 2A-8A. An examination of the...-
Document
Published: 01 Jan 1991
-
RB 96/00017 River Murray water resource management. Assessment of salt load impacts and drainage hazard for new irrigation development along the River Murray in South Australia.
The Murray-Darling Basin Commission (MDBC) has a commitment in the national interest to managing the health of the River Murray and floodplain environment by mitigating both decreases in river water quality and associated environmental degradation...-
Document
Published: 01 May 1996
-
RB 66/00060 Chowilla Project. Saline water disposal, Tilmy Flat. Geological investigation progress report no. 3. Co. Hamley - EWS Department.
This report describes the results of geological investigations carried out on the right bank of the River Murray, at and adjacent to Tilmy Flats. A summary of the work is as follows: 8 shallow observation wells to detect lateral movement of...-
Document
Published: 01 Jan 1968
-
RB 74/00152 Investigation of potential evaporation basins, Upper Murray, South Australia. Progress report 1. Appendix Analogue model experiments to determine saline groundwater flow into the Murray River system
Groundwater flow in the Upper Murray region is generally towards the River Murray except in the Noora area where contours show a depression in the water table surface. The Noora area appears to be the most suitable site for an evaporation basin for...-
Document
Published: 01 Jan 1974
-
RB 76/00016 Investigation of potential evaporation basins, Upper Murray, South Australia. Progress report no. 3.
Further drilling and aquifer testing between the proposed Noora evaporation basin and the River Murray yielded an average value of about 100 m3/day/m for transmissivity of the Loxton Sand aquifer. It is therefore expected that initial effects of such...-
Document
Published: 16 Feb 1976
-
RB 2003/00013 North-western Murray Basin geological synthesis, South Australia.
The Murray Basin is an intracratonic basin filled with Cainozoic fluvial to shallow marine sediments. Deposition in the Eocene and early Oligocene was characterised by floodplain and swamp deposits, emplaced with occasional interbeds of shelly clays...-
Document
Published: 01 Aug 2003