-
Mount Edarteenya (part of the Woodmurra Project). First annual report to licence expiry/full surrender, for the period 13/8/2007 to 12/8/2009.
Exploration of an area located approximately 70 km east of Oodnadatta for possible economic, buried Broken Hill or Cannington type Pb-Zn-Ag mineralisation hosted by inferred prospective basement metasedimentary and metavolcanic rocks, has consisted of...-
Document
-
Mount Perrypollkot (part of the Woodmurra Project). First annual report to licence expiry/full surrender, for the period 13/8/2007 to 12/8/2009.
Exploration of an area located approximately 80 km east-southeast of Oodnadatta for possible economic, buried Broken Hill or Cannington type Pb-Zn-Ag mineralisation hosted by inferred prospective basement metasedimentary and metavolcanic rocks, has...-
Document
-
Eaglehawk Dam (part of the Woodmurra Project). Combined first annual/final report to licence expiry/full surrender, for the period 25/11/2015 to 24/11/2016.
An area centred ~70 km south-east of Oodnadatta has been explored for possible buried economic giant Broken Hill type (BHT) stratiform Pb-Zn-Ag deposits which might be contained within strongly deformed and metamorphosed Palaeo- to Mesoproterozoic...-
Document
-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-04 - Woodmurra Project, Denison Inlier, Proterozoic metamorphosed volcanogenic basement stratiform/syngenetic Broken Hill type Pb-Zn-Ag prospects. Final report
An area lying ~70 km east and south-east of Oodnadatta is being explored for possible buried economic giant Broken Hill type (BHT) stratiform Pb-Zn-Ag deposits which may be contained within strongly deformed and metamorphosed Palaeo- to...-
Document
Published: 31 Oct 1916
-
Anna Creek (the Peake and Denison Project). Annual reports to licence expiry/full surrender, for the period 25/10/2019 to 24/10/2021.
A large area centred ~15 km to the south-east of Algebuckina on the Oodnadatta Track has been explored for possible buried economic IOCG type basement-hosted mineralisation, that may have formed within Paleo- to Mesoproterozoic rocks like those...-
Document
Published: 15 Nov 1921
-
Mount Arthur (part of the Woodmurra Project). Annual report and final report to licence full surrender, for the period 28/11/2014 to 9/3/2017.
An area centred ~70 km east of Oodnadatta has been explored for possible buried economic giant Broken Hill type (BHT) stratiform Pb-Zn-Ag deposits which might be contained within strongly deformed and metamorphosed Palaeo- to Mesoproterozoic...-
Document
Published: 23 Dec 1916
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. PACE Copper Discovery Drilling (drilling partnerships with DSD and industry) : Year 9 partnership no. DPY9-16 - Mount Denison. Drilling project final report.
A limited exploratory drill programme to test a deep target, that was partly subsidised by the SA Government under approved PACE Initiative Year 9 collaborative drilling project DPY9-16, was undertaken to investigate the potential for IOCG...-
Document
-
Mount Carulina and Trapeze Hill (the Oodnadatta Project). Joint annual reports plus succeeding single licence annual reports to licence expiry/full surrender, for the period 6/3/1995 to 12/10/2009. [ Index Part 1 of 2 ].
[ Note - here is Part 1 of the abstract relating to 2 separately indexed parts ]. As an adjunct to its widespread search for possible diamondiferous kimberlite diatremes on its Abminga Project acreage situated nearby to the north-west, Caldera...-
Document
Published: 09 Feb 1910
-
Data release [made at SA Director of Mines' discretion] : Mount Denison. Annual report for the period 13/3/2015 to 12/3/2019.
A small area centred ~80 km south-east of Oodnadatta is being explored for possible buried economic iron-oxide associated copper-gold-uranium (IOCGU) style mineralisation, as typified by the Olympic Dam and Prominent Hill deposits. The tenement was...-
Document
Published: 12 Mar 1916