-
Mount Edarteenya (part of the Woodmurra Project). First annual report to licence expiry/full surrender, for the period 13/8/2007 to 12/8/2009.
Exploration of an area located approximately 70 km east of Oodnadatta for possible economic, buried Broken Hill or Cannington type Pb-Zn-Ag mineralisation hosted by inferred prospective basement metasedimentary and metavolcanic rocks, has consisted of...-
Document
-
Mount Perrypollkot (part of the Woodmurra Project). First annual report to licence expiry/full surrender, for the period 13/8/2007 to 12/8/2009.
Exploration of an area located approximately 80 km east-southeast of Oodnadatta for possible economic, buried Broken Hill or Cannington type Pb-Zn-Ag mineralisation hosted by inferred prospective basement metasedimentary and metavolcanic rocks, has...-
Document
-
Mount Denison and Mount Charles (the Peake and Denison Project). Data release upon the expiry/full surrender of subsequent licences : respective annual and combined annual reports for the period 1/6/1994 to 31/5/1999. [ Index Part 2 of 2 ].
[ Note - here is only Part 2 of an abstract relating to 2 separately indexed parts ]. During the latter half of 1997, just before it transferred project management to BHP Minerals, Renison Gold Corp. carried out reconnaissance bedrock geochemical...-
Document
-
Data release - as updated : Edward Creek (part of the Edward Creek Joint Venture Project). Annual reports and final report to licence expiry/full surrender, for the period 23/9/2008 to 11/11/2018.
Reedy Lagoon Corp. (RLC) has continued to look for minerals other than diamond, operating as the manager of exploration work for base metals (mainly copper) and uranium that was undertaken by the Edward Creek Base Metal Joint Venture (“ECBMJV”) during...-
Document
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. PACE Copper Discovery Drilling (drilling partnerships with DSD and industry) : Year 9 partnership no. DPY9-16 - Mount Denison. Drilling project final report.
A limited exploratory drill programme to test a deep target, that was partly subsidised by the SA Government under approved PACE Initiative Year 9 collaborative drilling project DPY9-16, was undertaken to investigate the potential for IOCG...-
Document
-
West Lake Eyre. First progress report plus final report to licence full surrender, for the period 25/1/1980 to 13/6/1980.
Dampier Mining's main objective in taking out this licence was to test a large magnetic complex, situated east of the Peake and Denison Ranges and west of Lake Eyre, for possible economic buried base and precious metal deposits. Grid-based ground...-
Document
-
Data release [made at SA Director of Mines' discretion] : Edward Creek (part of the Edward Creek Joint Venture Project). Progress reports and annual reports for the period 7/12/1987 to 22/9/2008. [ Index Part 1 of 2 ].
Diamond exploration undertaken within the southern of two adjoining licence areas taken up along part of the western flank of the Peake and Denison Ranges, that is centred ~100 km south-east of Oodnadatta, was aimed at discovering the source(s) of...-
Document
-
Mount Arthur. Progress reports and final report to licence expiry/full surrender, for the period 5/9/1980 to 5/3/1983.
Exploration for possible kimberlite pipes in the Mount Arthur - Mount Toodla area, 30 km east-southeast of Oodnadatta, has included preliminary gravity and ground magnetic surveys, stream sediment sampling, and the drilling of a single diamond cored...-
Document
Published: 09 Jun 1983
-
Mount Carulina and Trapeze Hill (the Oodnadatta Project). Joint annual reports plus succeeding single licence annual reports to licence expiry/full surrender, for the period 6/3/1995 to 12/10/2009. [ Index Part 1 of 2 ].
[ Note - here is Part 1 of the abstract relating to 2 separately indexed parts ]. As an adjunct to its widespread search for possible diamondiferous kimberlite diatremes on its Abminga Project acreage situated nearby to the north-west, Caldera...-
Document
Published: 09 Feb 2010
-
Mount Arthur (part of the Woodmurra Project). Annual report and final report to licence full surrender, for the period 28/11/2014 to 9/3/2017.
An area centred ~70 km east of Oodnadatta has been explored for possible buried economic giant Broken Hill type (BHT) stratiform Pb-Zn-Ag deposits which might be contained within strongly deformed and metamorphosed Palaeo- to Mesoproterozoic...-
Document
Published: 23 Dec 2016
-
Mount Carulina and Trapeze Hill (the Oodnadatta Project). Joint annual reports plus succeeding single licence annual reports to licence expiry/full surrender, for the period 6/3/1995 to 12/10/2009. [ Index Part 2 of 2 ].
[ Note - here is Part 2 of the abstract relating to 2 separately indexed parts ]. A new joint venture with Barrick Gold, pertaining to the renewed (as EL 3424) tenement, was signed on 8/2/2007, after which that company as operator undertook a 749...-
Document
Published: 09 Feb 2010
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Denison. Second annual report for the period 13/3/2016 to 12/3/2017.
During licence Year 2, work comprised: • providing ongoing land access notifications to relevant landholders and the Native Titleholders; • acquisition over the entire tenement in April 2016 of the second phase of a ground gravity survey, consisting...-
Document
Published: 12 Mar 2017
-
Data release [made at SA Director of Mines' discretion] : Mount Denison. Annual report for the period 13/3/2015 to 12/3/2019.
A small area centred ~80 km south-east of Oodnadatta is being explored for possible buried economic iron-oxide associated copper-gold-uranium (IOCGU) style mineralisation, as typified by the Olympic Dam and Prominent Hill deposits. The tenement was...-
Document
Published: 12 Mar 2016