-
RB 79/00088 Wilkinson 1. Well completion report.
Wilkinson 1 stratigraphic well was drilled by the SA Department of Mines and Energy in mid-1978, about 250 km south-west of Coober Pedy, in the Tallaringa Trough. Here a thick section of Cambrian claystones, limestones and evaporites, at least 594 m...-
Document
Published: 01 Oct 1979
-
Tallaringa and Mount Igy (the Tallaringa JV Project). Joint annual reports to licences' joint full surrender, for the period 18/1/2009 to 6/2/2015.
During the 2009-2010 project joint reporting year, the following activities occurred: - the conduct of an Aboriginal heritage work area clearance survey in the northern part of EL 3485 Tallaringa by the Antakarinja Land Management Council Native...-
Document
-
Wilkinson Lakes. Progress reports to licence expiry/full surrender, for the period 14/7/1978 to 5/10/1981.
TARGET: Sedimentary uranium in Tertiary paleochannels draining the western margin of the Gawler Craton, and in sediments of the Wilkinson Trough. Base metals in Proterozoic basement rocks. EXPLORATION: Rotary drilling (48 holes totalling 3213 m),...-
Document
Published: 06 Apr 1981
-
Wilkinson Lakes. Progress and final reports to licence surrender for the period 24/2/1975 to 1/8/1975.
TARGET: Shallow Permian coal in the Tallaringa Trough, west of the Karari Fault. EXPLORATION: Reconnaissance rotary drilling (21 holes totalling 2009.3 m), plus an additional 12.2 m of bottomhole coring. RESULTS: No Permian coal measures were...-
Document
-
Mount Igy. Progress reports to licence expiry/full surrender, for the period 13/3/1980 to 12/9/1981.
TARGET: To define lignite in the Wilkinson Lakes lignite deposit which is of a composition that would be suitable to undergo carbon beneficiation and/or coal liquefaction processes; also, any economic oil shale occurrences and/or sedimentary uranium...-
Document
Published: 02 Sep 1981
-
Wilkinson Lakes area. Relinquishment report, August 1975.
There is no abstract created for this record-
Document