-
Permit EPP 26 - Duntroon Basin. Surrender report.
This EPP 26 surrender report has been furnished to the SA offshore Designated Authority as a result of the application made on 21/8/96 by BHP Petroleum for permission for the joint venture to surrender the permit, before committing to unwanted...-
Document
Published: 19 Feb 1997
-
Proposal to relinquish permit EPP 21, South Australia.
A complete re-evaluation of all known prospects and leads within EPP 21 was undertaken by the permittees in order to define any prospects worthy of drilling in permit Year 4, ending 28 June 1986, by which time a commitment to drill one well and...-
Document
-
1992 marine seismic survey, DH92, final report.
AIM: To confirm a number of prospects and leads outlined with the most recent interpretation of the existing seismic data over both permit areas. Due to the presence of shallow intrusives and difficulty in mapping the basement in certain areas,...-
Document
-
Greenly 001 EPP 26. Basic well completion report.
Greenly 1 wildcat was located in the southern part of EPP 26, approximately 10 km southeast of Platypus 1, 40 km west-northwest of Duntroon 1, and 150 km southwest of Port Lincoln. It was directionally drilled over the period 4 June to 14 August 1993...-
Document