-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 4 partnership DPY4-50, Mount Hope Project area stratigraphic drilling on potential Archaean VHMS mineral prospects. Project final report.
The PACE Initiative Year 4 subsidised auger drilling programme undertaken on the Mount Hope (EL 3355) / Brimpton Lake (EL 3561) mineral exploration tenements was a trial to test the application of a new low cost drilling technique to exploring under...-
Document
-
Venus Bay. Progress reports and final report to licence full surrender, for the period 9/1/1991 to 9/7/1992.
TARGET: Diamonds in 3 areas, one west of Lock, another east of Elliston, and the third surrounding Venus Bay. EXPLORATION: Heavy mineral sampling, airborne magnetic and multichannel radiometric surveys, ground magnetic surveys, and selected anomaly...-
Document
-
Final drilling report - CRAE boreholes 83KD1 and 83KD1A.
The intersection of massive halite in the ?Lower Palaeozoic sequence in Occidental Petroleum's Mercury 1 wildcat oil exploration well drilled in the offshore Polda Basin generated interest in the Tuckey area onshore for potash associated with similar...-
Document
-
ExpNotes ELLISTON: Explanatory Notes ELLISTON
There is no abstract created for this record-
Document
-
Wedge Hill (Mount Wedge Project). Annual and final reports for the period 26/5/1997 to 25/5/1999.
Groundwater sampling, aeromagnetic interpretation, shallow auger sampling and isotope studies were carried out over an area 30 km northeast of Elliston. Heavy mineral concentrates from composite auger samples contained zircon, galena and sphalerite,...-
Document