-
Data release - as updated [made at SA Director of Mines’ discretion] : Lock. Annual and combined annual reports for the period 22/4/2010 to 21/4/2014.
An exploration licence comprising three separate sub-blocks has been taken up with the primary goal of assessing the potential for additional coal resources to occur in proximity to the Lock coal deposit. During licence Year 1, the licensee sourced...-
Document
Published: 22 Mar 1913
-
Data release - as updated [made at SA Director of Mines' discretion] : Lock Project. Joint annual reports, for the period 22/4/2014 to 26/10/2018.
Two licences covering the undeveloped Jurassic coal measures of the Lock Coalfield have been taken up to allow initially for conducting research into the current technological and economic prospects for utilisation of the coal. Numerous samples of...-
Document
-
Venus Bay. Progress reports and final report to licence full surrender, for the period 9/1/1991 to 9/7/1992.
TARGET: Diamonds in 3 areas, one west of Lock, another east of Elliston, and the third surrounding Venus Bay. EXPLORATION: Heavy mineral sampling, airborne magnetic and multichannel radiometric surveys, ground magnetic surveys, and selected anomaly...-
Document
-
Kolballa. Progress reports and final report to licence full surrender, for the period 31/8/1990 to 15/7/1992.
TARGET: (Stockdale) Diamonds in the Elliston region, related to possible kimberlite primary sources that may be associated with the deep-seated Polda Trough structural feature; (BHP) Mineral sands in Tertiary sediments. EXPLORATION: Stockdale...-
Document
-
Coastal bitumen and potential source rocks, Duntroon Basin, South Australia.
This study, for which the supporting data was obtained between August 1983 and April 1984 and reported to the client Getty as Amdel report nos 5769/84 Parts 1-7, was prompted by a renewed exploration effort in the Duntroon Basin after some 9 years of...-
Document
Published: 31 May 1984
-
ExpNotes ELLISTON: Explanatory Notes ELLISTON
There is no abstract created for this record-
Document
-
Venus Bay. Third partial surrender report, for the period 27/7/1994 to 26/1/1998.
Diamond and gold exploration undertaken on the two relinquished ground portions located north-west and east of Venus Bay on Eyre Peninsula, which total 530 square km in area, have comprised heavy mineral sampling, heavy mineral grain microprobing,...-
Document
-
Venus Bay. Annual reports and final report to licence full surrender, for the period 27/7/1994 to 21/12/1998.
Diamonds and base and precious metal exploration undertaken north-east of Port Kenny on western Eyre Peninsula comprised loam sampling for kimberlite indicator minerals, RC drilling (7 vertical holes, total 470 m), plus bedrock petrological, heavy...-
Document
-
Lock. Progress and final reports to licence surrender for the period 8/2/1973 to 7/4/1974.
TARGET: Possible sedimentary uranium deposits in the Jurassic Polda Formation and Tertiary Poelpena Formation. EXPLORATION: To reconnoitre contemporary soil radiometry in the area, the near-surface sediments penetrated by 135 auger holes (all drilled...-
Document