-
Paratoo (was formerly part of the Grainger Project; recently made part of the Flinders Ranges JV Project). Annual reports from the time of cessation of previous joint venture(s) reporting, for the period 20/7/2007 to 1/11/2016.
During 2007-2008, the first year of the diamond exploration joint venture with the Filsell brothers in the Paratoo area, Flinders Mines' activities comprised: • acquiring part of a detailed helicopter-borne infill aerial magnetic ('helimag') survey,...-
Document
Published: 30 Jan 1919
-
Data release - as updated : Mount Grainger (part of the Flinders Ranges Diamond Project and the Nackara Arc Gold Project). Combined annual reports and annual reports to licence expiry/full surrender, for the period 6/2/2008 to 5/2/2017.
An area centred ~40 km east of Peterborough in the vicinity of Mount Grainger Goldfield has continued to be explored for possible small diamondiferous kimberlite bodies and for buried economic stratabound, structurally controlled and disseminated...-
Document
Published: 19 Sep 1916
-
Manunda Homestead. Final report at licence expiry/full surrender, for the period 25/6/1979 to 24/6/1980.
Diamond exploration over an area located approximately 35 km south-east of Yunta was undertaken to assess an interpreted structural environment that may be similar to one existing nearby to the west close to Terowie, in which shallowly buried,...-
Document
-
Lobethal. Progress reports to licence full surrender, for the period 12/1/1981 to 11/7/1981.
Gravel and stream sediment bulk sampling carried out at 83 sites in the upper Onkaparinga River Valley area (1660 kg processed for heavy mineral analysis and kimberlite indicator mineral determinations) has given no encouragement to the local Adelaide...-
Document