-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 1 partnership no. DPY1-03, Marathon South mineral prospect. Project interim and final reports.
During exploration of Exploration Licence 3209 situated on the northern Stuart Shelf, gravity and magnetic modelling performed in early 2004 highlighted several anomaly source bodies, which immediately became of much interest as potential iron-oxide...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-13, evaluation of the Marathon South mineral occurrence. Project interim and final reports.
Following further detailed ground gravity surveying and data processing carried out to better understand the gravity response of relatively dense and weakly magnetic basement rocks at the Marathon South prospect, located within EL 3209 and lying...-
Document
Published: 10 May 1906
-
Data release - as updated [made at SA Director of Mines’ discretion] : Glenside. Annual reports to licence expiry/renewal, for the period 5/12/2005 to 4/12/2010.
An area centred approximately 40 km south of the Andamooka Opal Field and 50 km south-east of the Olympic Dam mine is being explored for possible buried economic Olympic Dam or Prominent Hill type IOCG-U mineralisation as well as for possible...-
Document
Published: 28 Jan 1911
-
Data release - as updated [made at SA Director of Mines' discretion] : Carrapateena Arm, Hatch Hill, Beda Arm and Lake Torrens South (the OZ Minerals Carrapateena Project). Annual reports (separate and joint) for the period 8/1/2008 to 6/1/2016.
Exploration of the Lake Torrens JV Project area during 2008, managed by Teck Cominco Australia (Teck), consisted of diamond drilling some wedge holes off a parent to determine the lateral and vertical dimensions of bornite and chalcopyrite - dominated...-
Document
-
Lake Torrens - Port Augusta and Point Paterson areas. Progress reports to licence expiry/renewal, for the period 26/11/1977 to 30/11/1979.
SALT MINING STUDY: Field tests on the feasibility of Lake Torrens salt production to supply raw material for the planned Redcliff Petrochemical Project were continued, with project planning technical data demonstrations given to visiting officials of...-
Document
-
West Lake Torrens (part of the Murdie Project). Final report for geophysical, drilling and logistics program, Project ADI RD01-120 [part of Accelerated Discovery Initiative Round 1, 2021].
ADI funding was granted by DEM to Kelaray to conduct approved geophysical surveys and exploratory drilling and apply logistical support within its Murdie Project, for a combined expenditure of up to A$320,000. At the outset of the project, Kelaray...-
Document
-
Olympic Dam operations. Environmental management programme annual report. 01/03/90 - 28/02/91.
Reports on monitoring of: - air and solid waste pollution; - drill pad rehabilitation; - meteorology, vegetation, flora, fauna and soil salinity; - mine ground water drainage; - artesian water drawdown at Wellfield A in the Great Artesian Basin;...-
Document
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 1 partnership no. DPY1-02, Titan mineral prospect. Project interim and final reports.
Titan prospect is located within Exploration Licence 3209, and lies 30 km north of the Olympic Dam mine. The prospect was first drilled by Western Mining Corp. in 1976 with diamond drillhole BD 1, and in 1981 with a second hole, BD 2. Both holes hit...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 6 partnership DPY6-07 - Intercept Hill JV Project, central Stuart Shelf area - Oak Dam South Proterozoic basement IOCG mineral prospects. Drilling project final report.
The Intercept Hill Project area is located in the central part of the Stuart Shelf. Gawler Craton basement rocks in the project area comprise leucocratic granite of the Hiltaba Suite, volcanic rocks of the Gawler Range Volcanics and metasediments of...-
Document
-
RB 2016/00014 Geology of the Six Mile Hill 1:75 000 Special Edition Map Sheet.
The Six Mile Hill 1:75 000 Map Sheet was produced as part of a mapping program integrated into the Mineral Systems Drilling Program (MSDP) along the southern margin of the Gawler Ranges. The objective of the mapping program was to provide a regional...-
Document
Published: 01 Dec 2016
-
RB 2014/00006 Geology of the Cultana 1:100 000 map sheet (6432).
The revised digital geology map of the Cultana 1:100 000 map sheet and accompanying geological descriptions in this report are the first components of the 2nd edition PORT AUGUSTA 1:250 000 map sheet to be completed. The subject map sheet occupies the...-
Document
Published: 01 Jan 2014
-
Andamooka North area (the Saddle Hill Project). First annual report plus final report to licence expiry/full surrender, for the period 7/6/1996 to 6/6/1998.
Gravity and targeted mobile metal ion (MMI) soil geochemical surveys were carried out north-east of Olympic Dam, adjacent to WMC's tenements, to explore for Olympic Dam style mineralisation in Middle Proterozoic basement rocks at depth below the...-
Document
-
Regolith map of the southern Gawler Ranges margin (300 dpi & 600 dpi pdf formats).
This inaugural regolith map of the southern Gawler Ranges margin provides a valuable regional overview of the main regolith types and their associated landforms, plus a general outline of the major areas of bedrock or regolith-dominated terrain, as...-
Map
Published: 14 Jul 2016
- ZIP
-
Portulacca Ridge. Progress reports to licence expiry/renewal, for the period 16/3/1977 to 15/3/1979.
Areas around Woomera and extending to the north, to around 30 km west of Olympic Dam, were explored for concealed base metal deposits of Olympic Dam - type. Trace stratabound lead and zinc mineralisation (sphalerite and galena - few thousand ppm) had...-
Document