-
RB 90/00001 Explanatory Notes for the KIMBA 1:250 000 geological map.
The KIMBA 1:250 000 geological map sheet (hereafter referred to as KIMBA) lies in central Eyre Peninsula, extending between latitudes 33° to 34° S and longitudes 135° to 136°30'E (Fig 1). The principal towns are Kimba and Cleve, with smaller towns at...-
Document
Published: 01 Dec 1989
-
Koppio. Annual reports and final report to licence full surrender, for the period 6/1/1995 to 7/4/1997.
Geochemical sampling of ferruginous lag, stream sediments, BLEG soils, and rock chips, targeted possible Thompson Belt - type nickel-copper and precious metal mineralisation hosted by Lower Proterozoic Hutchison Group metasediments in an area 40 km...-
Document
-
The Western Eyre Peninsula JV Project. Data release made in lieu of submitting a first partial surrender report for EL 2662, and a final report at the surrender of EL 2711: joint annual reports for the period 26/8/1994 to 11/4/2002.
A high amplitude, linear N-S trending magnetic feature, dubbed the Coffin Bay Magnetic Anomaly, and the recognition of basement lithologies analogous to those of metallogenically prospective late Archaean terranes in Canada, were the impetus for...-
Document
Published: 17 Jun 1902
-
Menninnie Dam (part of the Fleurieu - Menninnie Dam Exploration Joint Venture Project). Combined annual report for the 5-year period 24/9/2005 to 26/10/2010, plus annual reports for the period 27/10/2010 to 26/10/2012.
During the 5-year period 2005-2010, intensified exploration undertaken at Menninnie Dam was focussed on the discovery and delineation of structurally controlled hydrothermal Pb-Zn-Ag mineralisation. Carbonate-rich Hutchison Group metasediments forming...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Mullaquana (part of the Mullaquana, later called Samphire, Uranium Project). Annual reports for the period 20/11/2009 to 19/11/2018.
During licence Year 4, UraniumSA undertook the following work on EL 3652: - pattern drilling of 232 rotary mud holes totalling 18,416 m, targeting the Blackbush and Plumbush prospects. - core drilling totalling 876 m in 8 holes, to characterise...-
Document
Published: 03 Dec 1918
-
The Eyre Peninsula Joint Venture Project. Joint annual reports for the period 19/9/2002 to 31/12/2008.
A number of tenements on central northern Eyre Peninsula are being explored by Adelaide Resources and its joint venture partner Newmont Mining for possible economic buried deposits of gold, copper and other base metals which may have formed in the...-
Document
Published: 27 Feb 1909
-
Uno (part of the Wilcherry Project). First partial surrender report, for the period 29/7/2009 to 24/1/2020.
An area centred ~105 km west-southwest of Port Augusta is being explored for possible economic buried, basement-hosted occurrences of epithermal/hydrothermal/metamorphic gold, silver, iron, uranium, and base metals mineralisation. On the now...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Cocata and Warramboo (part of the Eyre Peninsula Project). Annual reports and joint annual reports to licences' joint expiry/renewal, for the period 7/6/1996 to 5/6/2001.
Two adjacent licence areas forming part of a contiguous set of project tenements in the central Eyre Peninsula region are being explored by Adelaide Resources (AR) primarily for gold and base metals, which it is thought may occur in buried deposits...-
Document
Published: 28 Aug 1901
-
PACE Copper Discovery Drilling (drilling partnerships with DSD and industry): Year 9 partnership DPY9-11, Thurlga Ramp, northern edge of Cleve Domain, volcanic epithermal / hydrothermal replacement type precious metal prospects. Drilling final report.
A licence area, which lies adjacent on the west to Investigator Resources' Peterlumbo Hill EL 5368 containing the Paris silver deposit (where there is a currently inferred resource of 42 Moz @ 139 ppm Ag), is being explored under a joint venture with...-
Document
-
ExpNotes ELLISTON: Explanatory Notes ELLISTON
There is no abstract created for this record-
Document
-
Bull 055 A geochronological framework for the Gawler Craton, South Australia
This bulletin contains geochronological data and interpretations from the Gawler Craton of South Australia that have been completed by Mark Fanning of The Australian National University, by Geological Survey of South Australia personnel, and by...-
Document
-
Mount Hope, Moorlands and Brimpton Lake (the Mount Hope Project). Joint annual reports and joint final report to licences' respective expiry/full surrender, for the period 24/5/2005 to 4/6/2010.
Monax Mining has been exploring the subsurface geology of three licences in the Mount Hope region of south-western Eyre Peninsula, seeking possible economic komatiite - hosted nickel deposits and also any felsic volcanic sediment - hosted massive...-
Document
Published: 27 Oct 1910
-
Data release - as updated [made at SA Director of Mines’ discretion] : Verran. Annual reports submitted until the commencement of joint venture project joint reporting, for the period 29/1/2010 to 28/1/2014.
An area located in the Cowell Hills is being explored for possible economic buried iron ore deposits. The desired commodity is DSO (Direct Shipping Ore) haematite mineralisation similar to that of the Middleback Range iron deposits, where pods of...-
Document
Published: 23 May 1914
-
RB 00377 Port Lincoln [district] uranium exploration - report on completion of diamond drilling at the Hospital prospect.
The programme of uranium exploration described in this report commence on 18/5/1954, following the discovery of three separate occurrences of uraniferous gneiss near Port Lincoln township by local resident Mr J. Gibson. The largest of these outcrops,...-
Document
Published: 01 Dec 1900
-
Venus Bay. Third partial surrender report, for the period 27/7/1994 to 26/1/1998.
Diamond and gold exploration undertaken on the two relinquished ground portions located north-west and east of Venus Bay on Eyre Peninsula, which total 530 square km in area, have comprised heavy mineral sampling, heavy mineral grain microprobing,...-
Document
-
Elliston. First partial surrender report, for the period 20/2/1996 to 19/2/1998.
Three of nine untested magnetic anomalies, identified by the reprocessing of company aeromagnetic data acquired over an area east of Elliston, were drilled as part of a regional search for buried diamondiferous kimberlites. The resulting three...-
Document
-
Mount Wedge. Final report at licence surrender, for the period 26/5/1997 to 25/4/1999.
Shallow basement along basin margins, and intersections of structural lineaments with Hiltaba Suite granitoids, were targeted over three separate areas: 40 km north-east of Elliston, and 10 and 30 km respectively south and east of Lock. No significant...-
Document
-
Marble Range. Annual reports plus first partial relinquishment report, for the period 30/4/1997 to 16/3/1999.
Aircore drilling of gold and base metal targets (23 holes, total 1136 m) was undertaken following lag, rock chip and leach sampling and a review of previous aeromagnetic and drillhole data from three separate areas, 40 km west and 50 km north-west and...-
Document
-
RB 2020/00026 PACE Copper Gawler Craton Airborne Survey, Region 6, Gairdner - enhanced geophysical imagery and magnetic source depth models
This report presents the results of a study jointly conducted by the Geological Survey of South Australia and CSIRO Mineral Resources which aimed to enhance the expression of geological structure in geophysical images and to derive depth to magnetic...-
Document
Published: 01 Oct 2020
- ZIP,
-
Gawler Province regional geology 3D Model (3D version 1).
The Gawler Province 3D Geological Model is the second product of PIRSA's early 3D modelling trials conducted using 3D GeoModeller software. The work began with identifying the statigraphic units that were to be modelled. Due to the regional scale of...-
Model
- ZIP,