-
RB 2001/00004 CHILDARA bedrock drilling program.
Fifty-eight shallow aircore holes totalling 2140.5 m were drilled by PIRSA's Mineral Resources Group in the Ceduna area during November 1999 to as part of a programme designed to assist regional mapping and geological interpretation of the CHILDARA...-
Document
Published: 01 Aug 2001
-
PACE Copper Gawler Craton Airborne Survey, Region 5, data package.
During fine weather intervals within the period 21 June to 30 September 2018, the southern half of the CHILDARA 1:250k map sheet area and the onshore two-thirds of the STREAKY BAY 1:250k map sheet area were flown under contract to the SA Government...-
Dataset
- PDF,
- ZIP
-
Yellabinna. Annual reports and final report to licence expiry/full surrender, for the period 9/5/2005 to 10/10/2013.
An area with poor basement outcrop located approximately 110 km north-east of Ceduna and 40 km south-west of Tarcoola, which lies wholly within the eastern part of the Yellabinna Regional Reserve, is being explored primarily for possible economic...-
Document
Published: 28 Oct 2013
-
Thurlga Ramp (part of the Eyre Peninsula Project, Corrobinnie Uranium JV and Thurlga JV periods). Data release : final report at licence expiry/full surrender, for the period 1/1/2013 to 3/5/2019.
During the report period, licensee Andromeda Metals did no on-ground exploration. During its agreed 3-year earn-in period, joint venturer Investigator Resources undertook the following work described herein: - acquisition of high resolution aerial...-
Document
Published: 19 Jul 2019