-
AMIRA Project P544: Proterozoic sediment-hosted copper deposits. Quarterly progress reports and final report for the period July 2000 to October 2003.
The original objectives of this project were: 1) To understand the processes responsible for transporting, concentrating and fixing copper and other ore constituents during sedimentary basin evolution 2) To document the various stages and paragenesis...-
Document
-
Data release - as updated : Woordlemmie. Annual reports to licence full surrender, for the period 22/6/2011 to 22/11/2019.
An area situated a short distance to the east and south-east of CSR's historic Mount Gunson open cut copper workings, covering ground adjacent to the south-western and southern margins of Pernatty Lagoon, has been explored for possible buried economic...-
Document
Published: 26 Nov 1919
-
Dingo Hill. Progress reports to licence expiry/renewal, for the period 23/3/1977 to 22/3/1979.
An area of the southern Stuart Shelf, with untested potential for hosting possible stratiform base metal deposits within a probable concealed Early Proterozoic sedimentary basin embayment, was explored by BP as part of their regional mineral...-
Document
-
Yeltacowie, Hesso, Charlinga, Bowen Hill and Kangaroo Bluff (the Stuart Shelf Project). Joint annual reports and final report to licences' joint full surrender, for the period 16/8/2005 to 14/2/2014.
Uranium One Australia (U1A) acquired the Stuart Shelf Project tenements in 2005 with the aim of exploring for uranium mineralisation that has unconformity - related genetic features broadly analogous to those of deposits of the Athabasca Basin in...-
Document
Published: 28 May 1914
-
RB 2016/00014 Geology of the Six Mile Hill 1:75 000 Special Edition Map Sheet.
The Six Mile Hill 1:75 000 Map Sheet was produced as part of a mapping program integrated into the Mineral Systems Drilling Program (MSDP) along the southern margin of the Gawler Ranges. The objective of the mapping program was to provide a regional...-
Document
Published: 01 Dec 2016
-
Bowen Hill [part of Mount Gunson Project]. Annual reports for the period 27/11/98 to 26/11/2002.
Stratiform copper mineralisation in Neoproterozoic sediments of the Stuart Shelf, and Olympic Dam style Cu-Au mineralisation in Mesoproterozoic basement, were the targets of exploration in an area 50 km south-west from Mount Gunson. A regional soil...-
Document
-
Dingo Hill. Progress reports and final report to licence expiry/full surrender, for the period 21/8/1979 to 20/8/1980.
As part of BP's regional base metal prospectivity evaluation of the southern Stuart Shelf, seeking areas with untested potential for hosting possible stratiform base metal deposits within a probable concealed Early Proterozoic sedimentary basin...-
Document