-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 1 partnership DPY1-31 - Bute township area mineral prospect. Project interim and final reports.
The licensee, Peter Forwood, has been involved in mineral exploration at Bute for many years, initially with North Broken Hill Ltd in ELs 248, 420, 577 and 972, and has pursued the exploration of the area through many phases. Two important features...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Woocalla (part of the Mount Gunson Project). Annual reports and final report to licence expiry/renewal over a reduced area, for the period 4/8/1995 to 3/8/2000.
Stuart Metals took up EL 2099 covering ground in the Wirrappa - Lake Blyth - Bookaloo Siding area primarily to explore it for stratiform copper mineralisation of the various styles present in the Mount Gunson area. In addition, it was thought that the...-
Document
-
Salt Creek. Progress reports to licence expiry/renewal, for the period 13/9/1976 to 12/9/1978.
Possible buried stratabound copper mineralisation of Mount Gunson / Cattlegrid type was the target of exploration performed on an area of the Stuart Shelf located 60 km east of Woomera. After conducting detailed 1:12,000 and 1:16,000 scale geological...-
Document
-
Island Lagoon. Progress reports to licence expiry/renewal, for the period 23/3/1977 to 22/3/1979.
Basal Neoproterozoic Tapley Hill Formation - hosted stratiform copper was targeted primarily in this exploration programme, which consisted of reconnaissance deep percussion drilling (17 holes for a total advance of 4167 m) on the centres of...-
Document
-
Pernatty Lagoon. First partial surrender report, for the period 20/7/1975 to 19/7/1976.
1:25,000 scale geological mapping and scout stratigraphic drilling (9 vertical rotary holes for a total penetration of 758.5 m) have outlined the general distribution of Adelaidean rocks in the Lake Macfarlane and Island Lagoon areas. Perhaps the most...-
Document