-
Mount Plantagenet. Progress reports, annual reports and final report to licence expiry/full surrender, for the period 8/1/1982 to 7/1/1986.
Detailed base and precious metals exploration undertaken by Utah Development Company in the area of the Worumba Anticline has targeted possible stratiform Zambian Copperbelt - type deposits. Exploratory work has included 72 geochemical vertical...-
Document
-
Port Augusta - Lake Torrens area. Progress reports and final report to licence full surrender, for the period 28/11/1979 to 29/10/1986.
There is no abstract created for this record-
Document
-
Uro Bluff. Progress reports to licence expiry/full surrender, for the period 7/6/1977 to 6/6/1979.
Stratiform copper deposits, hosted within the Neoproterozoic Tapley Hill Formation, and possible diamondiferous kimberlite bodies were targeted in this exploration programme. Low value base metal intersections made from drilling (2 diamond holes,...-
Document
-
Kapunda. Progress reports to licence expiry/renewal, for the period 21/11/1973 to 20/11/1975.
Continuing assessment of the stratiform copper potential of the Kapunda Mine area and now also the surrounding country has consisted of diamond and percussion drilling, assaying of mineralised intersections (best intercept 10 m @ 2.13% Cu from 427-437...-
Document
Published: 22 Dec 1975
-
Surrender report, Kapunda joint venture, ELs 239 and 240, South Australia, for the JV period 29/4/1974 to 14/2/1978.
Utah Development Co. entered into a joint venture exploration programme with Northland Minerals Ltd in the Kapunda area of South Australia that has lasted from 29 May 1974 to 14 February 1978. Utah has managed this programme, which sought stratiform...-
Document
Published: 01 Jan 1978