-
Uro Bluff. Progress reports to licence expiry/renewal, for the period 16/4/1975 to 15/4/1977.
Stratiform copper sulphides, hosted within the basal Tapley Hill Formation, and extensions of known kimberlite bodies were targeted in this program. Reconnaissance and closer (down to 1 km x 1 km) spaced diamond and percussion drilling (28 and 83...-
Document
-
Data release made in lieu of submitting a first partial relinquishment report for EL 1319 : Mount Gunson (plus precursor parts of Charlinga and Pandurra). Licence-specific progress reports and technical reports for the period 25/10/1979 to 13/2/1987.
TARGET: Cattlegrid type copper deposits and Olympic Dam type copper-gold-uranium mineralisation. EXPLORATION: Ground magnetic, IP, gravity, SIROTEM, CSAMT, and seismic reflection surveys, photogeological and lithogeochemical studies, reprocessing of...-
Document
Published: 01 Jan 1987
-
Red Lake. Progress reports to licence expiry/renewal, for the period 12/1/1976 to 11/1/1978.
The exploration target for stratabound base metals in the Red Lake area, which lies just to the east of Pernatty Lagoon and abuts the Arcoona Plateau, was the top of Pandurra Formation erosional surface. Percussion (17 holes totalling 2619 m) and...-
Document