-
1980 seismic survey, Woolkanie, final report.
AIM:The 1980 Woolkanie Seismic Survey was primarily aimed at detailed gridding over areas of known commercial hydrocarbon accumulation, and more specifically was directed toward locating drilling exploration/appraisal sites on or near existing fields,...-
Document
-
1978 seismic survey, Perigundi, final report.
AIM:The 1978 Perigundi Seismic Survey was the fourth modern, digital Vibroseis survey conducted in the Cooper Basin, and was based on similar concepts to the 1973 Mudlankie, 1975 Tooroopie and 1976 Callamurra regional surveys, namely: 1) to further...-
Document
-
EOR (enhanced oil recovery) operations and ethane usage in the Cooper - Eromanga Basin.
A petroleum engineering consultancy review for SADME of the operation, results and economics of the existing Cooper Basin EOR projects, with comments on their likely outcome and the direction which should be taken in the development of future Unit and...-
Document