-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 1 partnership DPY1-46, western Gawler Range Volcanic Province mineral prospects. Project interim and final reports.
An area of the Gawler Range Volcanic Province that straddles the southern portion of the Yarlbrinda Shear Zone, 80 km south of Kingoonya, and which contains mylonitised and sericite-altered Palaeoroterozoic intrusive rocks, was the target for three...-
Document
-
Childara Well. Annual reports and final report to licence expiry/full surrender, for the period 19/2/2004 to 18/2/2009.
An area lying along the south-western margin of the Gawler Ranges has been explored by Minotaur Resources to assess the economic iron oxide - associated copper-gold mineralisation (IOCG) potential of near-coincident gravity and magnetic anomalies that...-
Document
Published: 23 Mar 1909
-
Data release - as updated [made at SA Director of Mines' discretion] : Deception Hill, Lake Everard West, Yellabinna, Cooritta Hill and Lake Everard (the Tunkillia Project). Joint annual reports for the period 1/1/2012 to 31/12/2018.
In 2012, the first year after the project's acquisition, TGL spent A$6.4M on gold exploration and on doing mining feasibility studies. The work program was mainly an ongoing evaluation of development opportunities for the Area 223 gold resource. Some...-
Document
Published: 29 Jan 1919
-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-01 - Nuckulla Hill Project, western Gawler Ranges, Mesoproterozoic shear-hosted gold-silver mineral prospects. Drilling project final report.
The Nuckulla Hill Project tenements are located within the Central Gawler Gold Province, and cover approximately 60 km extent of the Yarlbrinda Shear Zone (YSZ), from a northernmost point that is approximately 36 km south of the Tunkillia gold-silver...-
Document
-
Data release - as updated [made at SA Director of Mines discretion]: the Eyre Peninsula Project. Joint annual reports for the period 29/12/2013 to 28/12/2018.
During the 2014 project reporting year, licensee Adelaide Resources undertook a research and development phase surface-based biogeochemical and field portable X ray fluorescence (FPXRF) spectrometric sampling programme over its Baggy Green gold...-
Document
Published: 22 Apr 1919
-
Cooria Hill. Annual and final reports to licence expiry/full surrender for the period 1/12/2005 to 30/11/2010.
Exploration for possible epithermal / hydrothermal gold and/or IOCG drilling targets within an area located about 120 km north-east of Streaky Bay, on the north-eastern side of the Gawler Ranges near Lake Acraman, aimed at testing prominent...-
Document
Published: 27 Jan 1911
-
Yandoolka Well. First annual report plus final report to licence expiry/full surrender, for the period 16/11/2012 to 15/11/2014.
A large area on Lake Everard Station, extending for ~44 km north-south through the Gawler Ranges immediately south of Lake Gairdner, has been explored for possible buried epithermal gold which may occur along the south-eastwards trending arm of the...-
Document
Published: 27 Jan 1915
-
Data release - as updated : Nuckulla Hill, Lake Gairdner and Kondoolka (the Nuckulla Hill Gold Project). Joint annual reports and final report to licences' joint full surrender, for the period 25/8/2009 to 23/3/2018.
The Nuckulla Hill Au-Ag Project, originally consisting of three exploration licences covering 640 square km, is located approximately 115 km north-east of Ceduna in South Australia, and covers approximately 60 km strike length of the mineralised...-
Document
Published: 16 Oct 1917
-
Diesel Dam. First annual report plus final report to licence expiry/full surrender, for the period 16/11/2012 to 15/11/2014.
The Palaeoproterozoic Yarlbrinda Shear Zone is a broad and complex structure, which has both southwards and south-eastwards trending components that bifurcate near Tunkillia. The structure was a conduit for Mesoproterozoic hydrothermal fluids...-
Document
Published: 27 Jan 1915
-
RB 2016/00025 Geology of the Peltabinna 1:75 000 Special Edition Map Sheet.
The Peltabinna 1:75 000 Map Sheet was produced as part of a mapping program integrated into the Mineral Systems Drilling Program (MSDP) along the southern margin of the Gawler Ranges. The objective of the mapping program was to provide a regional...-
Document
Published: 01 Sep 2017
-
RB 2020/00026 PACE Copper Gawler Craton Airborne Survey, Region 6, Gairdner - enhanced geophysical imagery and magnetic source depth models
This report presents the results of a study jointly conducted by the Geological Survey of South Australia and CSIRO Mineral Resources which aimed to enhance the expression of geological structure in geophysical images and to derive depth to magnetic...-
Document
Published: 01 Oct 2020
- ZIP,