-
Thurlga Ramp (part of the Eyre Peninsula Project, Corrobinnie Uranium JV and Thurlga JV periods). Data release : final report at licence expiry/full surrender, for the period 1/1/2013 to 3/5/2019.
During the report period, licensee Andromeda Metals did no on-ground exploration. During its agreed 3-year earn-in period, joint venturer Investigator Resources undertook the following work described herein: - acquisition of high resolution aerial...-
Document
Published: 19 Jul 1919
-
Data release - as updated [made at SA Director of Mines discretion]: the Eyre Peninsula Project. Joint annual reports for the period 29/12/2013 to 28/12/2018.
During the 2014 project reporting year, licensee Adelaide Resources undertook a research and development phase surface-based biogeochemical and field portable X ray fluorescence (FPXRF) spectrometric sampling programme over its Baggy Green gold...-
Document
Published: 22 Apr 1919
-
Data release [made at SA Director of Mines' discretion] : Lake Everard West (part of the Gawler Craton Joint Venture, and latterly part of the Tunkillia JV Project). Annual & surrender reports for the period 7/6/1996 to 18/05/2021.
An area with poor basement outcrop located approximately 60 km south of Tarcoola, which largely lies within the north-eastern corner of the Yellabinna Regional Reserve, is being explored primarily for possible economic fault or breccia-hosted...-
Document
-
Deception Hill. Annual reports and final report to licence full surrender, for the period 26/10/2004 to 9/10/2013.
The iron oxide - associated copper-gold (IOCG) mineralisation potential of an area centred ~20 km south of Tarcoola, which appeared to contain untested but interesting gravity and soil geochemical anomalies, was investigated by Minotaur to try to...-
Document
Published: 28 Oct 1913
-
Yandoolka Well. First annual report plus final report to licence expiry/full surrender, for the period 16/11/2012 to 15/11/2014.
A large area on Lake Everard Station, extending for ~44 km north-south through the Gawler Ranges immediately south of Lake Gairdner, has been explored for possible buried epithermal gold which may occur along the south-eastwards trending arm of the...-
Document
Published: 27 Jan 1915
-
Diesel Dam. First annual report plus final report to licence expiry/full surrender, for the period 16/11/2012 to 15/11/2014.
The Palaeoproterozoic Yarlbrinda Shear Zone is a broad and complex structure, which has both southwards and south-eastwards trending components that bifurcate near Tunkillia. The structure was a conduit for Mesoproterozoic hydrothermal fluids...-
Document
Published: 27 Jan 1915