-
Roopena. Progress reports and final report to licence expiry/full surrender, for the period 30/6/1986 to 29/6/1988.
TARGET: Uranium in Proterozoic rocks in areas where these largely concealed by alluvial or weathered materials. EXPLORATION: RAB drilling during March-April 1987 (87 vertical open holes totalling 3583 m), investigation of radiometric anomalies...-
Document
Published: 01 Jan 1988
-
RB 2001/00006 Reconnaissance sampling of basement rocks of the Gawler Craton, South Australia, for dimension stone.
Eighty-five sites of crystalline basement rocks on the Gawler Craton were inspected to determine which lithological or stratigraphical units have potential for use as dimension stone. The Gawler Craton contains a variety of rock types including...-
Document
Published: 01 Oct 2000
-
RB 2015/00025 Zircon U-Pb geochronology from selected Paleoproterozoic igneous rocks of the Gawler Craton by laser ablation-inductively coupled plasma mass spectrometry.
This technical report presents laser ablation-inductively coupled plasma mass spectrometry (LA-ICPMS) U-Pb zircon geochronology data for 15 rock samples derived from locations spread across the Gawler Craton. The purpose of the subject dating project...-
Document
Published: 01 Sep 2015