-
Glenorchy. Progress reports for the period 3/10/85 to 2/4/87.
An assessment of the uranium and base metal potential of an area located 75 km north of Yunta included the inspection of historic uranium prospects, geological mapping at 1:25,000 scale, rock chip and groundwater sampling, reprocessing of aerial...-
Document
-
Calico Dam. Progress and annual reports, and final report to licence full surrender, for the period 3/7/1989 to 23/7/1999.
Interpretation of sets of airborne magnetic / radiometric survey data acquired over Proterozoic metasedimentary and granitoid basement terrain in the Kalabity area identified three discrete radiometric anomalies, one of which was traced by rock chip...-
Document