-
Weekeroo. Progress reports to licence expiry/full surrender, for the period 1/10/1970 to 30/9/1971.
A detailed examination of mineralised rock sequences within the metamorphosed Precambrian basement and Adelaidean cover rocks of the Weekeroo area, and recording of their relationship to successive deformational events and resulting rock structures,...-
Document
Published: 01 Sep 1971
-
Data release - as updated [made at SA Director of Mines' discretion] : Wadnaminga and Outalpa (the Olary JV Project, later renamed the Blue Rose Project). Joint annual reports for the period 19/7/2008 to 18/7/2018.
During Year 12 of the Olary JV Project (2008-2009), field work was undertaken only on EL 3849 Outalpa to make up for the earlier underspending on that licence relative to commitments. In early 2009, a ground radioactivity survey was acquired using a...-
Document
Published: 27 Nov 1918
-
Data release - as updated : Mutooroo (part of the Border Project). Annual reports [but excluding three separately held joint annual reports] and final report to licence expiry/full surrender, for the period 3/4/2007 to 18/4/2020.
During licence Year 11 (2007-2008), exploration activities on renewed EL 3745 included: • acquiring 1.9 line km of TEM profiles at Dingo prospect; • acquiring 21.4 line km of ground magnetic survey coverage at 1-metre station spacing on three...-
Document
-
Macdonald Hill. Progress reports and final report to licence expiry/full surrender, for the period 13/11/1979 to 12/11/1980.
Base metal exploration carried out over an area extending from 8 to 20 km north-northeast of Olary has consisted of a in-depth technical review of past exploration results, plus limited 1:10,000 scale geological mapping, bulk sampling of...-
Document
-
SADM / Amdel Project 1/1/170 : Petrology of the Olary region. Progress reports and final report for the period October 1974 to September 1977.
There is no abstract created for this record-
Document
-
Data release [made at SA Director of Mines' discretion] : Mutooroo. Annual reports to licence expiry/renewal, for the period 16/1/1997 to 2/4/2007. [ Index Part 1 of 2 ].
Palaeoproterozoic Willyama Supergroup metasediments, intrusive igneous rocks and volcanic rocks, plus Mesoproterozoic granitoids and associated mafic dykes, which occupy the south-western corner of the Broken Hill basement domain in an area centred...-
Document
-
Weekeroo Hill. Progress reports and final report to licence full surrender, for the period 18/4/1974 to 21/12/1974.
In a search for possible economic epithermal / stratiform / metamorphic base metals and gold within the Weekeroo Inlier, detailed geological mapping, rock chip sampling and an office evaluation of previous exploration were carried out for the Weekeroo...-
Document
-
Peaked Hill [formerly Trinity mine area]. Progress reports and final report to licence expiry/full surrender, for the period 27/7/1981 to 26/7/1983.
Ongoing exploratory RAB bedrock drilling of 302 shallow holes totalling 1919 m, over an area located approximately 40 km south-east of Olary, has shown that the Pegline Dam prospect is not base metal mineralised, and that the source of an IP anomaly...-
Document
-
Manna Hill. Progress reports to licence expiry/renewal, for the period 8/10/1970 to 7/10/1971.
Exploration for possible economic base metal sulphides hosted within a 10 square mile block of Carpentarian basement schists and gneiss, or within adjoining younger Adelaidean metasedimentary cover rocks, in an area located just north and west of...-
Document