-
South Puttapa. Progress and final summary reports for the period 15/7/1970 to 16/7/1971.
Appraisal of the Beltana zinc deposit continued during the current licence period, principally by diamond drilling (6 holes, total 2570 feet) aimed at delineating blind extensions to the main orebody on its southern side. The drilling was very...-
Document
-
Beltana mine and Aroona zinc mine mining leases and retention leases (part of the Flinders Ranges Project). Option period first annual report, for the period 1/1/2000 to 30/12/2000.
During the first year of its evaluation of the Beltana and Aroona mining properties on which it has taken out an option, Perilya undertook the following intensive work programme aimed at locating buried extensions and repetitions of the willemite...-
Document
-
Beltana mine area. Progress reports and final report to licence full surrender, for the period 27/9/1982 to 8/12/1987.
Renewed exploration by E-Z of the area surrounding the Beltana zinc mine has investigated the possibility for finding deep, unweathered Cambrian or Proterozoic carbonate-hosted zinc-lead sulphide mineralisation. It was considered that this target had...-
Document
-
Special Mining Leases nos 153, 153A and 153B; Mineral Claim nos 5092 and 5350. Summary report for the period 10/7/1967 to 16/7/1971.
This report summarises, in categoric fashion, all of the various exploratory and mine development activities carried out over the past four years on the broader Puttapa area exploration licence (as renewed), and within the mineral claims taken out...-
Document
-
Blinman - Wirrealpa area. Progress reports to licence expiry/renewal for the period 25/3/1971 to 24/3/1972.
There is no abstract created for this record-
Document