PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 1 partnership DPY1-31 - Bute township area mineral prospect. Project interim and final reports.
The licensee, Peter Forwood, has been involved in mineral exploration at Bute for many years, initially with North Broken Hill Ltd in ELs 248, 420, 577 and 972, and has pursued the exploration of the area through many phases. Two important features...-
Document
-
Data release [made at SA Director of Mines' discretion] : Yeltacowie (part of the Mount Gunson Project). Annual reports for the period 30/7/2003 to 6/10/2009.
The subject EL 3112 ground represents the continuation of tenure by Gunson Resources, over the same area, from its former EL 2516 Yeltacowie (for which see the relevant licence reports previously released in Envs 9530 and 9715). This replacement...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1994 to 17/10/2008 [ Index Part 3 of 4 ].
During the eighth year of tenure, work done on EL 2639 included: - the conduct of infill ground gravity and CSAMT surveys; - geophysical modelling and interpretation of the new survey data; - geological interpretation and refinement of drilling...-
Document
-
Pernatty Lagoon - Woocalla - Mount Gunson area. Progress reports and annual reports to licence expiry/full surrender, for the period 1/8/1963 to 25/8/1966.
TARGET: The area of abandoned shallow historic workings for secondary copper and manganese ore aligned along a sandstone - dolomitic limestone contact on the western edge of Pernatty Lagoon. EXPLORATION: A field inspection of the above workings,...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Yeltacowie (part of the Mount Gunson Project). Annual reports for the period 7/10/2009 to 6/10/2013.
New work undertaken on EL 4187 during the 2009-2010 licence year has included: • Ongoing documentation and interpretation of MGD 55 & 56 • Drilling of MGD57 to 1243 m at Emmie Bluff prospect • Down hole EM and IP logging of MGD57 •...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Eucolo Creek (also called the Churchill Dam Project). Annual reports for the period 31/1/2006 to 14/11/2018.
EL 3511 Eucolo Creek, of 528 square km, is situated near the eastern margin of the Gawler Craton within the Olympic Dam Domain, approximately 90 km south-west of the Olympic Dam IOCG-U deposit (3.98 billion tonnes at 1.1% Cu, 0.4 kg/t U3O8 and 0.5 g/t...-
Document
Published: 01 Dec 1918
-
Emmie Bluff. Progress reports to licence expiry/full surrender, for the period 3/3/1975 to 2/3/1976.
Exploration for possible economic buried Olympic Dam-style Cu-Au mineralisation, undertaken over an area located 15 km south-east of Arcoona Homestead, comprised preliminary airphoto interpretation and surface geological mapping, outcrop sample...-
Document
Published: 12 Mar 1976
-
Lake Macfarlane - Lake Finniss area. Progress reports to licence expiry/full surrender, for the period 1/7/1967 to 31/12/1967.
Consultants were engaged by the licensee to conduct an extensive geological and geochemical investigation of a 2700 square mile area surrounding the Mount Gunson copper deposit, and to perform an interpretation of available regional aeromagnetic data....-
Document