-
Yudnamutana Project, SML 704. Old Noll prospect. Report on drilling DDH NFK1.
Diamond drill-hole NFK1 was drilled to a total depth of 289.56 metres at the Old Noll prospect in November - December 1972, with the aim of intersecting the buried source of mineralization that has given rise to the boxwork structures outcropping...-
Document
-
Arkaroola (part of the Wooltana Joint Venture). Farminee's final report at joint venture exit, for the period April to October 1972.
Exploration for possible economic stratabound copper mineralisation, carried out by Shell Minerals Exploration (Australia) over part of SML 575/703 near Arkaroola in the northern Flinders Ranges under an informal joint venture agreement with the...-
Document
-
Yudnamutana Hill. Progress reports and annual reports to licence expiry/full surrender, for the period 20/5/1980 to 15/2/1995.
Base metal and gold exploration undertaken over a lengthy period since 1980 in the Yudnamutana Hill area, 20 km north-west of Arkaroola, has comprised detailed geological mapping of major basement and cover stratigraphic units and known mineral...-
Document
-
SML 704 Yudnamutana Project. Balancing Rock prospect with geochemical and petrological appendices by Amdel, Pontifex Mar-Jun 1973.
There is no abstract created for this record-
Document
Published: 01 Jan 1973