RB 55/00006;Amdel 00126 Accessory minerals of South Australian granites.
The purpose of the work described was to compare and contrast the petrography, accessory minerals, and absolute ages of 25 granitic and allied rock samples collected from widely scattered localities in South Australia. The processes that are...-
Document
Published: 01 Aug 1961
-
RB 92/00037 Review of mineral exploration, KINGOONYA 1:250 000 map area.
This report was prepared as a summary of all open file mineral exploration data from the KINGOONYA 1:250000 mapsheet area that are held in the SADME records management Envelope system. The aim of the holdings review was to describe past exploration,...-
Document
Published: 29 Nov 1991
-
Mabel Creek. Annual reports submitted until the commencement of joint licence reporting on the Mabel Creek JV Project tenements, for the period 20/12/1999 to 23/3/2006.
Exploration currently underway for possible economic buried iron oxide - associated copper-gold (IOCG) mineralisation within Proterozoic basement on the Mabel Creek High, in one of two joint venture group project licence areas located approximately 50...-
Document
-
Tarcoola. Data release in lieu of a 25% second partial surrender at licence renewal : progress and annual reports for the period 7/12/1990 to 20/4/2003. [ Index Part 1 of 4 ].
The abstract for this Envelope is contained (in three parts) as separately indexed records, due to SAMREF database system individual record data size limits presently applicable.-
Document
-
Codna Hill, Pumper Dam, Welcome Bore and Beresford Hill (part of Curdimurka Project). Data release at licences' joint surrender on 1/12/2008: combined first annual report for the period 20/8/2007 to 26/8/2008.
As part of a regional search for possible economic buried Olympic Dam type IOCG-U deposits emplaced along the north-eastern margin of the Gawler Craton, adjacent to the Peake and Denison Inliers, Barrick Gold has acquired infill helicopter-borne...-
Document
Published: 28 Jan 1909
-
The Neales River Project. Data release at licences' joint surrender on 1/12/2008: combined first annual report for the period 17/5/2007 to 16/5/2008.
As part of a regional search for possible economic buried Olympic Dam type IOCG-U deposits emplaced along the north-eastern margin of the Gawler Craton, adjacent to the Peake and Denison Inliers, Barrick Gold has acquired infill helicopter-borne...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-21, Yarlbrinda Shear Zone, subsidiary fault plays, Tunkillia - style gold prospects. Project final report.
It has lately been recognised by explorers that subsidiary fault splays developed adjacent to the main Yarlbrinda Shear Zone may be more prospective for hydrothermal gold deposits than the main zone. In an approved PACE Initiative Year 2 drilling...-
Document
-
Margaret Creek (part of the G2 Lineament Project). First and second partial relinquishments' combined report, for the period 13/10/2000 to 12/10/2004.
Diamond exploration undertaken within the relinquished portions of EL 2759, which are located immediately south of William Creek and near the Oodnadatta Track, was focussed on the margin of the Gawler Craton where it is cut by the NNW-trending G2...-
Document
-
Aurora Tank. Annual reports and final report to licence expiry/full surrender, for the period 26/3/1998 to 3/8/2006.
Exploration for Challenger - style vein gold deposits within concealed Archaean basement has been carried out in two licence subareas located on the northern part of the Commonwealth Hill pastoral lease, under a joint venture between the principal...-
Document
Published: 31 Jul 1907
-
Tallaringa and Mount Igy (the Tallaringa JV Project). Joint annual reports to licences' joint full surrender, for the period 18/1/2009 to 6/2/2015.
During the 2009-2010 project joint reporting year, the following activities occurred: - the conduct of an Aboriginal heritage work area clearance survey in the northern part of EL 3485 Tallaringa by the Antakarinja Land Management Council Native...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Tarcoola. Annual reports for the period 2/6/2008 to 29/7/2018.
During the first year of renewed EL 4167, in October and November 2008, Stellar Resources Ltd ("Stellar") completed a 5 hole, 1286.9 m RC and 2 hole, 157.1 m diamond cored inclined drilling programme at the Coolybring prospect which is located...-
Document
Published: 11 Sep 1918
-
Data release - as updated [made at SA Director of Mines’ discretion] : Aurora Tank. First annual report for the period 2/2/2010 to 1/2/2012, plus the next submitted licence-specific annual reports for the period 21/3/2013 to 1/2/2016.
No field work was done on the subject licence during its first year, while land access permissions were being organised with the required authorities. The licence area is located approximately 100 km south-west of Coober Pedy and lies within the...-
Document
-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-06 - Intercept Hill, Stuart Shelf, Mesoproterozoic IOCGU mineral prospects. Drilling project final report.
EL 5372 Intercept Hill is centrally located in the world class Olympic Dam Iron Oxide Cu-Au-U Province, at the centre of a cluster of iron oxide copper occurrences including Emmie Bluff, Oak Dam and Winjabbie. The Intercept Hill area has available...-
Document
Published: 19 Jan 1916
-
Giddi Giddina Creek, Leonard Rise, Mabel Creek and Cotton Bush (the Coober Pedy IOCG Project). Joint annual reports and final report to licences' joint full surrender, for the period 01/5/2013 to 12/1/2017.
Two separate grouped licence areas located to the north and the south-southwest of Coober Pedy have been explored for possible large buried economic basement-hosted IOCG deposits that would be of interest to new SA mineral explorer Vale (the...-
Document
Published: 15 Dec 1916
-
The Eyre Peninsula Project, and in part the Corrobinnie Uranium Joint Venture. Joint annual reports for the period 29/12/2008 to 31/12/2013.
During the sixth year of the project, licensee Adelaide Resources did not do any exploration directed at gold or base metals that might possibly occur on the subject tenements. However, its joint venture partner Quasar Resources undertook significant...-
Document
Published: 05 Mar 1914
-
Wilkinson Lakes East. Annual reports plus final report to licence full surrender, for the period 3/5/2010 to 6/2/2015.
An area centred ~150 km west of Coober Pedy, that is located mostly north-west of and that also has a small part lying immediately south-east of the Karari Fault, a major crustal structure which has controlled deposition at the southern limit of the...-
Document
-
PACE 2020 Discovery Drilling 2012 : Year 7 Drilling Partnership no. DPY7-18 - Phoenix Copper Limited Yorke Peninsula Project. Drilling project final report.
Phoenix Copper is exploring tenements which cover an area of approximately 802 square km on the west coast of the Yorke Peninsula, the company's prime objective being to discover an economic iron oxide - associated copper-gold-uranium (IOCGU) deposit...-
Document
Published: 13 Nov 1912
-
Data release - as updated [made at SA Director of Mines' discretion] : Pernatty [Station] and Yeltacowie (the Punt Hill IOCG Project). Joint annual reports for the period 29/11/2009 to 6/1/2012.
Two adjoining licence areas located in the country east of Pernatty Lagoon that lies between 80 and 180 km north of Port Augusta are being explored by Monax Mining Limited (Monax) for economic Proterozoic basement-hosted Iron-Oxide associated...-
Document
Published: 21 Jun 1912
-
Data release [made at SA Director of Mines' discretion] : Warrior (part of the Central Gawler Project). Annual reports to licence expiry/renewal, for the period 17/2/2005 to 16/2/2010.
Tasman Resources is exploring an area that is centred about 78 km north-west of Tarcoola for possible economic buried occurrences of sedimentary roll front style uranium in Tertiary palaeochannels and nickel mineralisation in Archaean -...-
Document
Published: 19 Apr 1910
-
Data release - as updated : Tallaringa North and Tallaringa South (part of the Coober Pedy Project). Joint annual reports to licences' joint expiry/full surrender, for the period 24/5/2012 to 23/5/2019.
Three areas centred ~120 km west south-west of Coober Pedy and lying in the northern part of the Gawler Craton, one located within the Mabel Creek Domain and the other two being adjacent and further to the south, within the Christie Domain next to a...-
Document