RB 97/00008 South Australian Steel and Energy Project. Coober Pedy iron ore investigation. Regional bedrock drilling 1995.
Following the acquisition and interpretation of 435 line km of ground magnetic surveys over selected aeromagnetic anomalies within regions of high magnetic relief on the northern Gawler Craton, 121 reverse circulation holes totalling 8609.25 m were...-
Document
Published: 01 Jan 1997
-
Data release - as updated [made at SA Director of Mines' discretion] : Johns Outstation / Giffen Well. Annual reports for the period 8/10/2007 to 7/10/2018.
To date, land access restrictions imposed by the Commonwealth Department of Defence have prevented any field work from occurring on the subject tenement, taken up to cover the Giffen Well magnetite iron ore deposit and adjacent inferred prospective...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Tarcoola. Annual reports for the period 2/6/2008 to 29/7/2018.
During the first year of renewed EL 4167, in October and November 2008, Stellar Resources Ltd ("Stellar") completed a 5 hole, 1286.9 m RC and 2 hole, 157.1 m diamond cored inclined drilling programme at the Coolybring prospect which is located...-
Document
Published: 11 Sep 1918
-
Safari, Lake Woorong, Leonard Rise, Thunderstorm Creek and Brumby Creek areas (Coober Pedy Ridge Project). Quarterly and six-monthly progress, plus annual and final, joint activity reports for the period 22/4/1991 to 22/3/2000.
The Coober Pedy Ridge / Mount Woods Inlier project investigated a 170 km long east-west belt of medium to high grade Proterozoic metamophics and syn- and post tectonic granites, centred 25 km south of Coober Pedy, for Broken Hill type stratiform...-
Document
-
Pondooma / Ironstone Hut (part of the Northern Eyre Peninsula Project). Final report at licence full surrender, for the period 3/12/2002 to 24/9/2015.
An area originally granted as Exploration Licence 3048 Pondooma, which consisted of two separate sub-blocks centred ~60 km south-west of Whyalla, was applied for to cover a poorly exposed belt of banded iron formation (BIF) strata identified on...-
Document
-
RB 2018/00003 Summary and final report on pyrite, magnetite and hematite mineral geochemistry, South Australia (including samples from the Mineral Systems Drilling Program and the Emmie Bluff IOCG prospect).
Sulfide and oxide trace element geochemical analyses have been conducted on more than 290 core chip samples collected from stored drill cores of 39 drillholes located across South Australia, as part of a collaborative project being conducted between...-
Document
Published: 01 Feb 2018
-
Gilles Downs (part of the Northern Eyre Peninsula Project). First annual report (prior to start of joint reporting status) for the period 8/7/2005 to 7/7/2006: and final report submitted at licence full surrender, for the succeeding period to 30/7/2015.
A licence area consisting of two separate sub-blocks located on the plains extending to the west of the Middleback Range on north-eastern Eyre Peninsula was taken up to explore for possible economic buried deposits of stratabound magnetite iron ore...-
Document
-
Peterlumbo, Botenella Range, Lake Gilles [West], Eurilla Dam, Wilcherry Hill, Uno, Mount Miccollo and Tin Hut Hill (the Wilcherry Hill Project). Joint annual reports for the period 6/6/2002 to 31/10/2008. [Index Part 1 of 2].
Aquila Resources took up ownership of the much previously-explored ground comprising the Wilcherry Hill Project with the intent of exploring for the first time the iron oxide - associated copper-gold & uranium (IOCG-U) mineralisation potential of...-
Document
Published: 31 Dec 1908
-
Ironstone Hill (part of the Northern Eyre Peninsula Project). Final report at licence full surrender, for the period 17/9/2003 to 17/9/2015.
During the majority of its tenure term, very little field work was conducted on the subject ground. Initially, office studies of available geophysical and open file geological data were performed during 2005 to try to identify possible drilling...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Warramboo (the Central Eyre Project). Annual reports [but excluding four separately held joint annual reports] for the period 6/6/2001 to 8/2/2019.
During the sixth year of tenure of the Warramboo licence, now held by Adelaide Exploration Limited as renewed EL 2846 covering the same 1363 square km area as before, the only exploration-related activity which occurred was the acquisition during...-
Document
Published: 28 Mar 1918