Aurora Tank. Annual reports and final report to licence expiry/full surrender, for the period 26/3/1998 to 3/8/2006.
Exploration for Challenger - style vein gold deposits within concealed Archaean basement has been carried out in two licence subareas located on the northern part of the Commonwealth Hill pastoral lease, under a joint venture between the principal...-
Document
Published: 31 Jul 1907
-
Tallaringa and Mount Igy (the Tallaringa JV Project). Joint annual reports to licences' joint full surrender, for the period 18/1/2009 to 6/2/2015.
During the 2009-2010 project joint reporting year, the following activities occurred: - the conduct of an Aboriginal heritage work area clearance survey in the northern part of EL 3485 Tallaringa by the Antakarinja Land Management Council Native...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Aurora Tank. First annual report for the period 2/2/2010 to 1/2/2012, plus the next submitted licence-specific annual reports for the period 21/3/2013 to 1/2/2016.
No field work was done on the subject licence during its first year, while land access permissions were being organised with the required authorities. The licence area is located approximately 100 km south-west of Coober Pedy and lies within the...-
Document
-
Wilkinson Lakes East. Annual reports plus final report to licence full surrender, for the period 3/5/2010 to 6/2/2015.
An area centred ~150 km west of Coober Pedy, that is located mostly north-west of and that also has a small part lying immediately south-east of the Karari Fault, a major crustal structure which has controlled deposition at the southern limit of the...-
Document
-
Data release [made at SA Director of Mines' discretion] : Warrior (part of the Central Gawler Project). Annual reports to licence expiry/renewal, for the period 17/2/2005 to 16/2/2010.
Tasman Resources is exploring an area that is centred about 78 km north-west of Tarcoola for possible economic buried occurrences of sedimentary roll front style uranium in Tertiary palaeochannels and nickel mineralisation in Archaean -...-
Document
Published: 19 Apr 1910
-
Data release - as updated : Tallaringa North and Tallaringa South (part of the Coober Pedy Project). Joint annual reports to licences' joint expiry/full surrender, for the period 24/5/2012 to 23/5/2019.
Three areas centred ~120 km west south-west of Coober Pedy and lying in the northern part of the Gawler Craton, one located within the Mabel Creek Domain and the other two being adjacent and further to the south, within the Christie Domain next to a...-
Document
Published: 19 Jun 1919
-
Data release - as updated [made at SA Director of Mines’ discretion] : Lake Phillipson. Annual reports to licence expiry/renewal, for the period 27/4/2000 to 8/8/2010.
During the sixth licence year, on renewed EL 2717 covering the same area as previously, the licensee, now a wholly owned subsidiary of AuIron Energy Limited (formerly Meekatharra Minerals Limited), progressed its investigations of the geology of the...-
Document
Published: 01 Sep 1916
-
Commonwealth Hill Station - East (part of the Commonwealth Hill Project). First partial surrender report, for the period 2/7/2007 to 1/7/2017.
Five small portions of the subject licence, with a combined total area of 143 square km, have been surrendered due to their now perceived diminished prospectivity for iron ore, gold, uranium and base metals. During the period of their tenure,...-
Document
Published: 04 Dec 1917
-
Data release - as updated [made at SA Director of Mines' discretion] : Commonwealth Hill area (the Eaglehawk Joint Venture Project). Annual reports for the period 22/6/2012 to 21/6/2017.
An area centred ~115 km south-west of Coober Pedy is being explored for possible economic buried precious and/or base metal mineralisation (including iron ore) that may exist in predominantly buried Archaean or younger Proterozoic basement rocks, as...-
Document
Published: 29 Aug 1917
-
Gina Outstation (part of the Commonwealth Hill Project). Final report at licence full surrender, for the period 1/7/2013 to 3/4/2017.
No field work was performed on the subject licence during its last year of tenure. However, this Envelope contains all of the earlier (including that collected within the last 5 years) licence-specific soil calcrete geochemical, gravity survey and...-
Document
Published: 27 May 1917
-
Data release - as updated [made at SA Director of Mines' discretion] : North-west Olympic Domain Project. Joint annual reports plus annual reports for the period 8/10/2013 to 7/10/2018. Plus partial/expiry/full surrender reports to 24/04/2024.
Ten licences distributed across a broad region of the north-eastern Gawler Craton, between Roxby Downs and Coober Pedy, are being explored for possible buried economic IOCG style mineralisation. Research and interpretation completed by the licensee...-
Document
Published: 20 Nov 1918
-
Data release - as updated [made at SA Director of Mines' discretion] : Commonwealth Hill, Commonwealth Hill Station - Central and East, and Aurora Tank areas (the Commonwealth Hill Project). Joint annual reports for the period 1/7/2013 to 30/6/2018.
During the sixth year of the project, base metals exploration was focussed on the Mars-Aurora Tank, Wirrida and Bundi prospects using ground gravity and IP survey methods. Some trial magnetotelluric and audio-frequency magnetotelluric survey profiles...-
Document
Published: 05 Sep 1918
-
Bull 055 A geochronological framework for the Gawler Craton, South Australia
This bulletin contains geochronological data and interpretations from the Gawler Craton of South Australia that have been completed by Mark Fanning of The Australian National University, by Geological Survey of South Australia personnel, and by...-
Document
-
Garford [Outstation], Indooroopilly Outstation and Half Moon Lake (the Challenger West Project). Joint annual reports and joint final report to licences' respective expiry/full surrender, for the period 30/4/2003 to 13/10/2010.
The three licences comprising the Challenger West Project were taken up principally to explore for economic gold, which could possibly occur in strike extensions of known gold lodes formed within Archaean basement rocks that constitute the Challenger...-
Document
-
RB 2007/00011 Original full content version of] OOLDEA, South Australia, [geological map] sheet SH52-12. South Australia. Geological Survey. 1:250 000 Series - Explanatory Notes.
The OOLDEA 1:250 000 map area, in the far west of SA, includes portions of the Maralinga Tjarutja Aboriginal Lands, Maralinga Prohibited Area, and Nullarbor Regional Reserve. It is traversed by the Trans-Australian Railway. There is no significant...-
Document
Published: 01 Jun 2007
-
RB 2007/00017 The geology of the Mulgathing Complex: from eastern Tallaringa to Glenloth Goldfield.
Reconnaissance investigations of outcropping rocks of the western and central Mulgathing Complex reveal a series of pelitic and psammitic sedimentary rocks, interleaved with generally mafic to intermediate composition meta-igneous lithologies. The...-
Document
Published: 01 Sep 2007
-
RB 2007/00002 Commonwealth Hill magnetic anomaly, north-western Gawler Craton: an interpretation and results of zircon LA-ICPMS U-Pb dating.
High precision geochronological analyses of metamorphic and inherited magmatic zircon grains, which were obtained from stored percussion drillhole samples of a garnet gneiss that occurs within the Commonwealth Hill magnetic anomaly, north-western...-
Document
Published: 01 Jan 2007
-
RB 2010/00015 Constraints on the timing of brittle faulting at [the] Challenger Mine.
The orebody at the Challenger gold mine shows remarkable down-plunge continuity, from the surface to some 1400 m vertical depth, which is geometrically equivalent to a down-plunge length of ~2800 m. However, at ~220 RL within the mine, the orebody is...-
Document
Published: 01 Aug 2010
-
Wirrida. Second partial surrender report for the period 17/10/2002 to 16/10/2005.
An office-based prospectivity review only has been performed on the relinquished portion of the licence, while on-ground activities have concentrated on the Blue Bore and Target 14a prospects located within the retained acreage. Previously, new...-
Document
-
PACE Copper Gawler Craton Airborne Survey, Region 4A, data package.
During the period 19 January to 12 May 2017, parts of the OOLDEA, NULLARBOR, BARTON and FOWLER 1:250k map sheet areas were flown under contract to the SA Government and Geoscience Australia as part of the PACE Copper Gawler Craton Airborne Survey....-
Dataset
- PDF,
- ZIP