Mount Carulina and Trapeze Hill (the Oodnadatta Project). Joint annual reports plus succeeding single licence annual reports to licence expiry/full surrender, for the period 6/3/1995 to 12/10/2009. [ Index Part 2 of 2 ].
[ Note - here is Part 2 of the abstract relating to 2 separately indexed parts ]. A new joint venture with Barrick Gold, pertaining to the renewed (as EL 3424) tenement, was signed on 8/2/2007, after which that company as operator undertook a 749...-
Document
Published: 09 Feb 1910
-
Pine Ridge (part of the Central Giles Nickel Project). Annual reports and final report to licence surrender, for the period 30/3/2007 to 9/6/2015.
A licence area located in South Australia's Far North-west Aboriginal Lands, approximately 140 km north-west of Marla, has been explored primarily for massive magmatic nickel sulphide deposits possibly associated with the Proterozoic Giles Complex...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Davies (part of the Central Giles Nickel Project). Annual reports for the period 4/3/1999 to 23/9/2009.
A licence area located in South Australia's Far North-west Aboriginal Lands, and centred approximately 20 km to the south-east of the Surveyor Generals Corner at the borders of Western Australia, South Australia and the Northern Territory, has been...-
Document
-
Abminga Diamond Project. Data release made at licence renewal [and project cessation]: progress reports and annual reports for the period 25/10/1993 to 17/3/2004.
The Abminga Diamond Project, undertaken by Caldera Resources NL, was granted exploration project status, including permission for EL joint reporting, in July 1996. This event followed up to two years of work by other operators on a number of...-
Document
-
East Deering Hills. Annual reports to licence surrender for the period 27/4/1994 to 25/9/2003.
Mafic and ultramafic rocks of the Proterozoic Giles Complex, which have intruded highly metamorphosed basement units of the Musgrave Block in an area 360 km WNW of Marla, were considered to have potential to host massive Ni sulphide mineralisation,...-
Document
Published: 02 Apr 1903
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Caroline, Mount Harcus and Pine Ridge (the Musgrave Project). Joint annual reports for the period 1/7/2011 to 31/12/2018.
Three Exploration Licences spread across the central and eastern Musgrave Ranges are now being explored by NiCul Minerals Limited (a wholly owned subsidiary of PepinNini Minerals Limited) which currently owns 100% of each tenement. The ground held is...-
Document
Published: 28 Feb 1919
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 6 partnership DPY6-30 - Hanging Knoll portion of Woodroffe Project area - Proterozoic basement-hosted base and precious metal mineral prospects. Drilling project final report.
Targeted stratigraphic and mineral exploratory drilling recently carried out by PepinNini Minerals within its EL 3931 Hanging Knoll was done as part of the sixth round of Theme 2 of the PACE Initiative (Primary Industries and Resources South...-
Document
Published: 15 Feb 1911
-
Data release [made at SA Director of Mines' discretion] : Hanging Knoll (part of the Central Giles Nickel Project). Annual reports to licence expiry/renewal, for the period 18/3/2002 to 17/3/2007.
A licence area located at the south-eastern end of the Mann Ranges in South Australia's Far North-west Aboriginal Lands, approximately 90 km south-southwest of Ayers Rock (Uluru), is being explored by Rio Tinto Exploration (RTE) and Delta Gold, as...-
Document
Published: 12 Apr 1907
-
Data release [made at SA Director of Mines’ discretion] due to licence expiry and pending approval of its subsequent re-grant : Pine Ridge (part of the Central Giles Nickel Project). Annual reports for the period 25/2/1999 to 29/3/2007.
A licence area located in South Australia's Far North-west Aboriginal Lands, approximately 140 km north-west of Marla, has been explored by Rio Tinto Exploration (RTE) as part of work planned for a larger set of project exploration licences currently...-
Document
-
The Musgrave Project. Joint annual reports for the period 5/10/2007 to 31/1/2012 [as later updated, to include additional licences, to 31/1/2017], plus respective successive full surrender final reports for individual licences.
The multi-licence Mithril - Barrick JV Musgrave Project area is centred 600 km south-west of Alice Springs, within the APY Lands of north-western South Australia. It is considered to be prospective for buried economic Ni-Cu-PGE sulphide mineral...-
Document
Published: 09 Oct 1917
-
Data release [made at SA Director of Mines' discretion] : Mount Hardy (part of the Central Giles Nickel Project). Annual reports to licence expiry/renewal, for the period 18/3/2002 to 17/3/2007.
A licence area located at the eastern end of the Deering Hills in South Australia's Far North-west Aboriginal Lands, approximately 150 km south-west of Ayers Rock (Uluru), is being explored by Rio Tinto Exploration (RTE) and Delta Gold, as part of...-
Document
Published: 12 Apr 1907
-
North Deering Hills (Yalukula and Palatu). Annual reports to licence full surrender, for the period 20/10/1995 to 6/9/2003.
Mafic and ultramafic rocks of the Proterozoic Giles Complex, which have intruded highly metamorphosed basement units of the Musgrave Block in an area 380 km WNW of Marla, were considered to have potential to host massive Ni sulphide mineralisation,...-
Document
-
Mount Howe. First partial surrender report, for the period 26/9/1994 to 15/4/1997.
Exploration over the eastern flank of the Musgrave Block to the north of De Rose Hill, for potential buried Giles Complex layered intrusive bodies, comprised SAEI data interpretation, airborne magnetic, radiometric and electromagnetic surveys, ground...-
Document