-
Murray Bridge. Progress reports, annual reports and final report to licence expiry/full surrender, for the period 15/7/1991 to 14/1/1994.
Exploration was undertaken by BHP along the western margin of the Murray Basin, between Lake Alexandrina and Cambrai township, for possible economic heavy mineral sands and for exhalative sedex-style volcanogenic/stratabound base metal deposits, both...-
Document
-
Currency Creek and Langhorne Creek (formerly part of the Fleurieu JV Project, then part of the Adelaide Hills Project). Joint final report to licences' joint full surrender, for the period 4/6/1992 to 18/10/2016.
Two slightly separated areas located in the west-central Kanmantoo Trough geological region have been explored for possible economic buried metalliferous deposits by successive licence owners over an almost 25 year - long tenure. The subject report...-
Document
-
RB 76/00079 Monarto construction sand investigation, Reedy Creek sand deposit - Monarto Development Commission.
There is no abstract created for this record-
Document
Published: 10 Jun 1976
-
Lake Alexandrina. Annual report and final report to licence expiry/full surrender, for the period 3/11/1997 to 2/11/1999.
Exploration for lacustrine evaporites and for detrital heavy minerals on and near the shores of Lake Alexandrina, south of Milang, had previously located minor deposits of garnet sands along a 700 m stretch of beach on the northern shore of Sturt...-
Document
-
Lake Alexandrina. Combined first annual / final report at licence expiry/full surrender, for the period 7/6/1996 to 6/6/1997.
Possible Cainozoic garnet-rich heavy mineral sand placer deposits that might have been derived from erosion of Cambrian Kanmantoo Group metasediments were investigated by very shallow auger drilling (11 holes, total 19 m) and beach sand sampling...-
Document
-
Morgan. Final report at licence full surrender, for the period 12/4/2007 to 16/7/2014.
After its purchase of the subject EL 5069 on 8/7/2013, a single drilling campaign was undertaken by Iluka Resources during August-October 2013, when 11 RC aircore vertical open holes were drilled for a total penetration of 266.5 m. Ten of the holes...-
Document
Published: 09 Jul 2014
-
Lake Alexandrina. Combined first annual/final report at licence expiry/full surrender, for the period 4/1/1999 to 3/1/2000.
Five push tube cored sediment samples (two taken from sites onshore and three from sites offshore) were taken in the northern part of Lake Alexandrina, 20 km east-northeast of Milang. Previously reported heavy mineral placer concentrations of up to...-
Document
Published: 04 Jan 2000