-
Port Augusta. Annual report to licence expiry/full surrender for the period 3/9/2004 to 2/9/2005.
An area located immediately north of Port Augusta was taken up to explore for possible economic gold, base metals and diamonds. However, continuing uncertainties concerning who were the correct holders of Native Title rights and a consequent lack of...-
Document
-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-09 - Margaret Dam, southern margin, Peake and Denison Inliers, kimberlite diamond prospect. Drilling project final report.
Monax Alliance's Margaret Dam Project is located on their EL 5347 Francis Creek, which is centred approximately 40 km south of William Creek in northern South Australia. The initial project work done for licence operator Monax Mining by geophysical...-
Document
-
Models for potential mineralisation, EL 519, Port Pirie - northern Yorke Peninsula.
There is no abstract created for this record-
Document
-
Francis Swamp. Combined first and second annual reports/final report to licence expiry/full surrender, for the period 9/10/2013 to 8/10/2015.
An area believed to cover the concealed southern margin of the Peake and Denison Domain of the Northern Gawler Craton was taken up by the Monax-Antofagasta copper exploration consortium to explore for possible buried economic iron-oxide associated...-
Document
Published: 24 Nov 1915
-
Data release - as updated : Crystal Brook and Port Pirie (the Wandearah Project). Joint annual reports to licences' respective full surrenders, for the period 2/8/2008 to 26/4/2018.
Buried basement-hosted iron oxide - associated copper-gold (IOCG) mineralisation of either Moonta-Wallaroo or Olympic Dam style is the target of ongoing exploration on the two adjacent subject tenements. In addition, the current holder considers that...-
Document
Published: 29 May 1918
-
Stuart Creek. Progress reports and final report to licence expiry/full surrender, for the period 20/8/1979 to 18/10/1982.
One vertical stratigraphic diamond drillhole [the 1a re-drill] was fully cored to 1450 m total depth over a regional gravity high in the western half of the licence which was thought to be prospective for Olympic Dam type polymetallic mineralisation...-
Document
-
Data release [made at SA Director of Mines' discretion] : Crystal Brook, Port Broughton, Port Pirie, Mundoora and Winninnowie (the Moonta North Project). Annual reports and combined annual reports for the period 19/10/2000 to 1/8/2008.
Buried basement-hosted iron oxide - associated copper-gold (IOCG) mineralisation of either Moonta-Wallaroo or Olympic Dam style is the target of exploration across a number of scattered Exploration Licences trending from Port Broughton in the south to...-
Document
Published: 18 Sep 1908
-
RB 2014/00006 Geology of the Cultana 1:100 000 map sheet (6432).
The revised digital geology map of the Cultana 1:100 000 map sheet and accompanying geological descriptions in this report are the first components of the 2nd edition PORT AUGUSTA 1:250 000 map sheet to be completed. The subject map sheet occupies the...-
Document
Published: 01 Jan 2014