-
Glyde Hill. Combined first annual/final report to licence surrender for the period 29/8/2006 to 30/11/2006.
An area located immediately south of central Lake Gairdner was targeted by Newcrest for possible economic buried iron oxide - associated copper-gold (IOCG) style mineralisation associated with Mesoproterozoic lower Gawler Range Volcanics sequence...-
Document
-
Bulgunnia, Gosse and Kingoonya (the Mentor Project). Data release made at the surrender of subsequent licences : annual reports for the period 27/10/1992 to 15/11/1997. [Index entry Part 1 of 2 - a very long abstract is split between these two parts].
The Gawler Joint Venture partners (Dominion Mining and Resolute Resources) have been exploring three near-contiguous areas located in the north of the Tarcoola - Kingoonya district, seeking possible economic concealed epithermal/mesothermal...-
Document
-
Mount Miccollo, Tin Hut Hill, Eurilla Dam, Wilcherry Hill, Uno, Peterlumbo and Mount Double (the Wilcherry Hill Project). Joint annual reports for the period 1/11/2002 to 31/10/2018.
During Year 6 of the project, Trafford Resources designed their drilling program to test the extent of the Pb/Zn/Ag/U mineralisation at the Telephone Dam Prospect, while JV partners Ironclad Mining’s drilling program was designed to define the Direct...-
Document
-
Nuckulla [Hill]. Information status at licence full surrender, for the period 4/2/2016 to 9/3/2017 : no work performed.
There is no abstract created for this record-
Document
-
Fairview [Homestead]. Information status at licence full surrender, for the period 19/1/2016 to 13/4/2017 : no work performed.
There is no abstract created for this record-
Document
-
[Mount] Fairview. Information status at licence full surrender, for the period 17/2/2016 to 9/3/2017 : no work performed.
There is no abstract created for this record-
Document
-
Glyde [Hill]. Information status at licence full surrender, for the period 4/2/2016 to 9/3/2017 : no work performed.
There is no abstract created for this record-
Document
-
Waurea. Information status at licence expiry/full surrender, for the period 4/2/2016 to 3/2/2018 : no work performed.
There is no abstract created for this record-
Document
-
Wilcherry Hill. Drilling at the Weednanna Au-Fe deposit, an exploration model for gold deposits formed in the southern Gawler Craton. Collaborative drilling and research final report, Project ADI RD02-265 [Accelerated Discovery Initiative Round 2, 2022].
Between 8 August and 6 October 2021, six inclined, rotary mud precollared diamond cored holes (21WDDH001 to 006) totalling 1560.6 m were drilled at the Weednanna gold and iron deposit located ~40 km north of Kimba on northern Eyre Peninsula, as part...-
Document
-
Mount Double. First partial surrender report for the period 24/11/2005 to 23/11/2007.
Exploration for possible buried economic iron oxide - associated copper-gold (IOCG) mineral deposit targets within the subject relinquished area of the south-central Gawler Ranges utilised existing regional gravity data to attempt to identify...-
Document
-
Conical Hill. First partial surrender report for the period 18/1/2006 to 17/1/2008.
Work done for EL 3486 during the first two years of tenure comprised reviews of existing geological and geophysical information conducted independently by Minotaur Exploration and Toro Energy. EL 3486 was partly covered by a major government-funded...-
Document
-
Yarna Hill. Annual reports to licence expiry/full surrender for the period 19/11/2002 to 4/12/2010.
An area of sparse basement outcrop situated to the west of Lake Acraman in the central Gawler Ranges district was taken up to explore for possible economic Olympic Dam style mineralisation, based on the licensee's evaluation of past drillhole data...-
Document
-
Palthrubie Hill. Annual reports to licence expiry/full surrender for the period 21/5/2002 to 4/12/2010.
An area situated to the west of Lake Acraman in the central Gawler Ranges district was taken up to explore for possible economic Olympic Dam style mineralisation, based on the licensee's evaluation of past drillhole data which indicated that a number...-
Document
-
Yarlbrinda South. Annual reports and final report to licence full surrender, for the period 20/1/2004 to 10/1/2011.
An area located approximately 80 km north-east of Streaky Bay was taken up to explore for possible Hiltaba Suite intrusion-related, structurally controlled gold mineralisation formed at the southern end of the Yarlbrinda Shear Zone (YSZ) , in a...-
Document
-
Pandurra. Combined first annual/final report to licence full surrender, for the period 26/6/2013 to 23/10/2014.
A small area centred ~50 km west of Port Augusta was taken up to explore for possible buried epigenetic and structurally controlled gold mineralisation in Archaean and Proterozoic basement rocks. The target was related to a 3.5 km long, >3 ppb Au...-
Document
-
RB 2017/00008 Fluid inclusion data from 23-Mile Quartz Quarry and Parkinson Dam, northern Eyre Peninsula.
Seven samples of hydrothermal quartz displaying textures suggestive of vein formation in an epithermal environment were collected from quartz veins at two sites on north-eastern Eyre Peninsula. A combined fluid inclusion and oxygen-isotope study was...-
Document
Published: 01 Feb 2017
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-25, southern Gawler Ranges Volcanic Province, Victory IOCG mineral prospect. Project final report.
Southern Gold Ltd, in joint venture with Hindmarsh Resources, has drilled four vertical RAB with diamond tail holes on Exploration Licence 3158 from October to November 2005 as part of the PACE Initiative Year 2 programme. Its objective was to test a...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Wartaka, Iron Knob, Reid Lookout and Old Wartaka (the Parkinson Dam Project). Annual reports and joint annual reports for the period 17/2/2005 to 26/4/2019.
Four small, adjacent licences located on the south-eastern, shallow subcrop margin of the Gawler Ranges, which together make up an area centred about 25 km north-east of Lake Gilles and 60 km west of Port Augusta, are being explored for possible...-
Document
Published: 30 Apr 2018
-
Iron Knob (part of the Parkinson Dam Project). Fifth partial surrender report, for the period 17/2/2005 to 26/4/2020.
50% of the former area of EL 5602 has been surrendered, splitting the licence into two remnant sub-blocks. Late in 2014, an initial field reconnaissance followed by surface geochemical sampling was carried out in the soil covered, previously untested...-
Document
Published: 26 Jun 2020
-
Peterlumbo, Botenella Range, Lake Gilles [West], Eurilla Dam, Wilcherry Hill, Uno, Mount Miccollo and Tin Hut Hill (the Wilcherry Hill Project). Joint annual reports for the period 6/6/2002 to 31/10/2008. [Index Part 2 of 2].
The Telephone Dam lead-zinc-silver prospect is located in the north-eastern part of the now renewed Wilcherry Hill EL 4162. During the 1980s and 1990s, diamond, RC and RAB drilling done on this prospect by Aberfoyle Resources had identified a...-
Document
Published: 31 Dec 2008