-
Tarcoola. Data release in lieu of a 25% second partial surrender at licence renewal : progress and annual reports for the period 7/12/1990 to 20/4/2003. [ Index Part 1 of 4 ].
The abstract for this Envelope is contained (in three parts) as separately indexed records, due to SAMREF database system individual record data size limits presently applicable.-
Document
-
Carnding. Data release made in lieu of submitting a second partial relinquishment report at licence expiry/renewal : progress reports and annual reports for the period 29/9/1994 to 16/1/2005.
Renewed brownfields gold exploration in an area situated 20-40 km north and west of the Tarcoola Goldfield, previously held in part by the licensee as EL 1848, was prompted by the May 1995 success of the Samantha/Resolute/Dominion corporate joint...-
Document
Published: 28 Jul 1905
-
Data release [made at SA Director of Mines’ discretion] : Tarcoola. Annual reports to licence expiry/renewal, for the period 2/6/2003 to 1/6/2008.
Exploration Licence 3089 is located in the central Gawler Craton and is centred near the township of Tarcoola. Continuation of tenure over the same area, from former ELs 1827 and 2510, was renewed by Gravity Capital Ltd on 2/6/2003, and full licence...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Carnding. Annual reports to licence expiry/renewal, for the period 5/7/2005 to 4/7/2009.
EL 3369 is located in the central Gawler Craton, and is centred approximately 35 km west and west-northwest of Tarcoola. The licence area consists of two geographically separate [by ~5 km] blocks – exploration activity in the eastern block has...-
Document
-
Warrior. Annual reports to licence expiry/full surrender, for the period 7/11/1994 to 13/8/2001.
Following initial assessment of available data, exploration for copper, gold and base metals in an area 60 km west of Tarcoola concentrated on regional calcrete sampling. Analysis for gold and a suite of base metals indicated several areas of...-
Document
Published: 26 Jun 1901
-
Tarcoola. Progress reports and final report to licence expiry/full surrender, for the period 30/3/1973 to 29/3/1974.
Detailed, 1:1200 scale geological mapping was carried out over the 126 square mile Tarcoola Goldfield, but it excluded the old mine workings and focussed instead on five areas which Abadon thought might have potential for discovering downfaulted...-
Document
Published: 20 Feb 1974