-
Porter Hill. Annual reports for the period 26/8/1998 to 26/5/2000 (the commencement of the Lake Torrens Project joint reporting period) : part of a data release made on 31/12/2006 upon a subsequent partial surrender.
Following the detection in late 1997, by reconnaissance mobile metal ion partial leach analytical methods, of anomalous base and precious metal concentrations in the soil above several low amplitude magnetic anomalies on Tasman Resources' EL 2340, the...-
Document
Published: 25 Oct 1999
-
RB 00814 Display of drillcore from Olympic Dam.
Thirty core trays containing confidential diamond drillcore that is representative of company exploration drillhole RD 16 located at Olympic Dam [hole total depth 1318.9 m] were provided by EL 536 licensee Western Mining Corp. Ltd and placed on public...-
Document
-
Lincoln Gap (part of the Eastern Eyre Peninsula Project). First annual report and final report to licence expiry/full surrender, for the period 30/9/2009 to 29/9/2011.
An area located approximately 20 km south-west of Port Augusta has been explored for possible economic unconformity-hosted uranium at the base of the Pandurra Formation, for copper sulphides near the Beda Volcanics - Pandurra Formation contact, and...-
Document
-
Data release [made at SA Director of Mines' discretion] : Andamooka (part of the Stuart Shelf Project). Progress reports to licence expiry/renewal, for the period 2/5/1975 to 1/5/1977. [ Index Part 1 of 2 ].
An inaugural exploration licence covering land in the Roxby Downs Station and Andamooka Station holdings was taken up by Western Mining Corp. (WMC) to document the stratigraphic section present in the northern portion of the Stuart Shelf tectonic...-
Document
-
Middleback Range, SA. SMLs 204 and 205 1969 geochemical survey report.
Two separate orientation geochemical sampling programmes have been undertaken during 1969 over BHP's Special Mining Lease areas near Whyalla. In the Pandurra Station area, shallow residual soils over known mineralised Carpentarian bedrock were...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 18/10/2008 to 24/3/2018.
During licence Year 15 (2008-2009), activities at Mount Gunson comprised: - pegging of three Mineral Claims at the MG 14 deposit in December 2008; - acquiring part of a larger project-wide ground gravity survey during April-May 2009 (510 stations...-
Document
Published: 22 Aug 2018
-
Data release - as updated [made at SA Director of Mines' discretion] : Yeltacowie (part of the Mount Gunson Project). Annual reports for the period 7/10/2013 to 6/10/2018.
An area located ~25 km north-east of Woomera is being explored for possible economic buried Cu-Co-Au mineralisation which may have formed in the Adelaidean metasedimentary cover rocks of the Stuart Shelf. Under Gunson Resource's prior tenure of EL...-
Document
Published: 07 Dec 2018