-
TEISA Coober Pedy Drilling Project.
There is no abstract created for this record-
Document
-
Orroroo. Progress reports to licence surrender for the period 18/11/1971 to 28/9/1972.
In a continuation of diamond and base metal exploration of newly discovered carbonatite / kimberlite intrusive bodies in an area located immediately north of Orroroo, these bodies were examined petrographically and analysed to compare their...-
Document
-
Appraisal of the northern Flinders Gunsight Project, South Australia.
This report reviews exploration work done from 1965 through 1993 by North Flinders Mines and four joint venturers on the Northern Flinders Ranges Gunsight Project. The enormous number of reports and interpretive maps generated are listed as...-
Document
-
Mount Pitt. Progress and final reports for the period 6/4/81 to 5/10/81.
As part of a regional search for economic small-scale deposits of rare earth metals in the Mount Painter district, geochemical prospecting revealed several atypically high background niobium values, in stream sediments derived from watercourses known...-
Document
-
Archaean Metabasic Diamond Drilling Project.
The Archaean Metabasic Diamond Drilling Project was undertaken by SADME Regional Geology Branch (part of the Geological Survey of South Australia) in two locations within the north-western Gawler Craton. Metasediments in this region include banded...-
Document
-
Paratoo (was formerly part of the Grainger Project; recently made part of the Flinders Ranges JV Project). Annual reports from the time of cessation of previous joint venture(s) reporting, for the period 20/7/2007 to 1/11/2016.
During 2007-2008, the first year of the diamond exploration joint venture with the Filsell brothers in the Paratoo area, Flinders Mines' activities comprised: • acquiring part of a detailed helicopter-borne infill aerial magnetic ('helimag') survey,...-
Document
Published: 30 Jan 1919
-
Data release [made at SA Director of Mines’ discretion] : Kapinnie (part of the Brimpton Lake Project). Annual reports for the period 17/9/2003 to 4/3/2010.
An area extending to the north of Kapinnie on western Eyre Peninsula area is being explored by grant licensee Anglo American and (since March 2003) its joint venture partner Lynch Mining, looking for possible buried economic Archaean volcanic or...-
Document
-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-09 - Margaret Dam, southern margin, Peake and Denison Inliers, kimberlite diamond prospect. Drilling project final report.
Monax Alliance's Margaret Dam Project is located on their EL 5347 Francis Creek, which is centred approximately 40 km south of William Creek in northern South Australia. The initial project work done for licence operator Monax Mining by geophysical...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Bimbowrie. Annual reports for the period 4/11/2009 to 11/11/2018.
During licence Year 6 (2009-2010), the first year of tenure of renewed EL 4375, the main exploration activities undertaken by Sinosteel-PepinNini Curnamona Management Pty Ltd (SPCM) were to conduct two drilling campaigns, the first designed to...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Prospect Hill. Annual reports for the period 25/7/2006 to 24/7/2018.
Continued evaluation of possible economic primary tin oxide mineralisation at three known separate occurrences in the Prospect Hill area, lying 20 km north-west of Moolawatana Homestead, has focussed on the untested zone immediately below the known...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Kalabity. Annual reports for the period 25/2/2009 to 11/3/2019.
The main exploration activities undertaken during the first year of tenure of renewed EL 4239 (licence Year 6, 2009-2010) consisted of drill testing of uraniferous prospects defined by previous exploration, after the prior acquisition of an airborne...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Outalpa (part of the Curnamona Project). Annual reports for the period 10/6/2012 to 9/6/2018.
The Outalpa (EL 3472) licence area, comprised of two separate sub-blocks respectively centred ~30 km north-northeast and ~45 km north-northwest of Manna Hill, is one of five adjacent tenements held by PepinNini Minerals within the eastern Adelaide...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Menninnie Dam (part of the Fleurieu - Menninnie Dam Exploration Joint Venture Project). Annual reports for the period 24/9/2001 to 23/9/2005.
The buried Menninnie Dam zinc-lead(-silver-copper) deposit, located approximately 55 km north of Kimba on northern Eyre Peninsula, and sitting adjacent to the south-eastern margin of the Gawler Ranges, is being evaluated for its future commercial...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Brimpton Lake. Annual reports for the period 9/2/2005 to 8/8/2018.
An area of the southern Gawler Craton, which is located on Eyre Peninsula east of Elliston, is continuing to be explored for possible economic buried Archaean to Proterozoic bedrock-hosted primary base and precious metal deposits of inferred...-
Document
-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-04 - Woodmurra Project, Denison Inlier, Proterozoic metamorphosed volcanogenic basement stratiform/syngenetic Broken Hill type Pb-Zn-Ag prospects. Final report
An area lying ~70 km east and south-east of Oodnadatta is being explored for possible buried economic giant Broken Hill type (BHT) stratiform Pb-Zn-Ag deposits which may be contained within strongly deformed and metamorphosed Palaeo- to...-
Document
Published: 31 Oct 1916
-
Data release - as updated : Western Lake Gairdner. Annual reports and final report to licence expiry/full surrender, for the period 22/2/2011 to 21/2/2018.
An area centred ~100 km south-east of Tarcoola is being explored for possible economic buried Carrapateena or Prominent Hill style IOCG and polymetallic skarn style mineralisation which may be associated with zones of elevated relief seen in existing...-
Document
Published: 29 May 1918
-
Eastern Mabel Creek Ridge (part of the Mabel Creek Project). Final report for exploratory drilling programme, Project ADI RD01-135 [part of Accelerated Discovery Initiative Round 1, 2021].
The Mabel Creek Ridge, which is situated adjacent to the central eastern margin of the Gawler Craton, is an ENE trending ridge of shallowly covered basement rock which displays high magnetic and gravity relief. The ADI Round 1 work proposal submitted...-
Document
-
Mt Craig Critical Minerals Project. Final report, Project ADI RD03-411 [Accelerated Discovery Initiative Round 3, 2022]. Morgan Creek Prospect Drilling and Geophysics Programs, April 2023.
This ADI funded programme consisted of exploration drilling, geophysics programs and aboriginal employment relating to critical mineral exploration conducted over the Mt Craig Project in the Flinders Ranges of South Australia. ADI funded activities...-
Document
-
Yudnapinna [West]. Combined first annual/final report to licence expiry/full surrender, for the period 22/9/2020 to 21/9/2021.
Two contiguous exploration licences, ELs 6522 and 6523, were secured in the Yudnapinna district to apply new concepts and techniques aimed at revitalising the rate of copper-gold mineral deposit discovery in South Australia. The licences’ area lay...-
Document
Published: 03 Nov 1921
-
Yudnapinna [East]. Combined first annual/final report to licence expiry/full surrender, for the period 22/9/2020 to 21/9/2021.
Two contiguous exploration licences, ELs 6522 and 6523, were secured in the Yudnapinna district to apply new concepts and techniques aimed at revitalising the rate of copper-gold mineral deposit discovery in South Australia. The licences’ area lay...-
Document
Published: 03 Nov 1921