-
PACE Copper Discovery Drilling (drilling partnerships with DSD and industry): Year 9 partnership DPY9-05 - Mount Sarah Project, Oodnadatta district, Proterozoic basement inferred epithermal/hydrothermal IOCG mineral prospect. Drilling final report.
A small licence area centred approximately 70 km north-northwest of Oodnadatta is being explored for possible economic buried IOCG type mineralisation that may have formed in the wholly concealed, almost unknown basement rocks there. Interest is...-
Document
Published: 28 Sep 1917
-
Apatite fission track analysis of samples from the western Eromanga Basin and Eringa Trough, Australia.
16 rock samples from wells and outcrop in the western Eromanga Basin / Eringa Trough region were analysed for their apatite grain fission track properties to derive an interpretation of the geothermal history of the enclosing strata.-
Document
-
Apatite fission track analysis of samples from Eringa Trough and western Eromanga Basin, Australia.
17 rock samples from 5 wells in the western Eromanga Basin / Eringa Trough region were analysed for their apatite grain fission track properties to derive an interpretation of the geothermal history of the enclosing strata.-
Document
-
Ruby Hill. Progress and final reports to licence surrender for the period 1/12/1980 to 31/5/1982.
During a search for possible diamondiferous rocks within an area lying to the north of William Creek and abutting the south-eastern side of the Peake and Denison Ranges, stream sediment sampling and a low level, 5300 line km aeromagnetic / radiometric...-
Document
Published: 02 Jun 1982
-
Allandale. First annual report to licence renewal, for the period 5/12/1994 to 31/5/1995.
Following recognition of the likely young age of the sources of the Abminga area magnetic anomalies, and the discovery of a number of diamond indicator minerals in sediments to the west of the Peake and Denison Ranges, the Allandale joint venture...-
Document
-
ExpNotes ABMINGA: Explanatory Notes ABMINGA
There is no abstract created for this record-
Document
-
RB 2015/00003 PACE Geochronology: Results of collaborative geochronology projects, 2013–2015.
The PACE Geochronology program fosters collaboration on projects of geological and metallogenic significance with focus on dating rocks and minerals from samples suggested by companies through a competitive proposal-based selection process. Successful...-
Document
Published: 01 Aug 2017