-
Porter Hill. Annual reports for the period 26/8/1998 to 26/5/2000 (the commencement of the Lake Torrens Project joint reporting period) : part of a data release made on 31/12/2006 upon a subsequent partial surrender.
Following the detection in late 1997, by reconnaissance mobile metal ion partial leach analytical methods, of anomalous base and precious metal concentrations in the soil above several low amplitude magnetic anomalies on Tasman Resources' EL 2340, the...-
Document
Published: 25 Oct 1999
-
[ Report on drilling ] Evaluation of the East Lagoon orebody, Mount Gunson, South Australia.
This report presents the results of ore definition drilling derived from 60 percussion and diamond drill holes put down over the central and southern parts of the East Lagoon orebody, and gives the methodology for calculating currently mineable ore...-
Document
-
Cattlegrid mine and surrounding lease areas. Mine planning calculations of deposit reserves, including those of orebody extensions, plus a report on a review of copper resources, for the period 1983-1984.
There is no abstract created for this record-
Document
-
RB 00814 Display of drillcore from Olympic Dam.
Thirty core trays containing confidential diamond drillcore that is representative of company exploration drillhole RD 16 located at Olympic Dam [hole total depth 1318.9 m] were provided by EL 536 licensee Western Mining Corp. Ltd and placed on public...-
Document
-
Lincoln Gap (part of the Eastern Eyre Peninsula Project). First annual report and final report to licence expiry/full surrender, for the period 30/9/2009 to 29/9/2011.
An area located approximately 20 km south-west of Port Augusta has been explored for possible economic unconformity-hosted uranium at the base of the Pandurra Formation, for copper sulphides near the Beda Volcanics - Pandurra Formation contact, and...-
Document
-
Data release [made at SA Director of Mines' discretion] : Andamooka (part of the Stuart Shelf Project). Progress reports to licence expiry/renewal, for the period 2/5/1975 to 1/5/1977. [ Index Part 1 of 2 ].
An inaugural exploration licence covering land in the Roxby Downs Station and Andamooka Station holdings was taken up by Western Mining Corp. (WMC) to document the stratigraphic section present in the northern portion of the Stuart Shelf tectonic...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 18/10/2008 to 24/3/2018.
During licence Year 15 (2008-2009), activities at Mount Gunson comprised: - pegging of three Mineral Claims at the MG 14 deposit in December 2008; - acquiring part of a larger project-wide ground gravity survey during April-May 2009 (510 stations...-
Document
Published: 22 Aug 2018
-
Reedy Lagoon. Progress reports and final report to licence expiry/full surrender, for the period 12/1/1981 to 11/1/1983.
Exploration for Olympic Dam style mineralisation included ground magnetic and gravity surveys carried out east of Mount Vivian. Diamond drilling of one hole to 674.6 m total depth intersected minor pyrite and possibly trace of chalcopyrite at the base...-
Document
-
Pernatty. Annual reports to licence expiry/full surrender, for the period 20/3/2018 to 19/3/23.
The Pernatty Project is located approximately 20 km SSE of the IOCG deposit at Carrapateena, within Exploration Licence 6137. The area was initially targeted by Tasman Resources Ltd due to available geophysical data, the possibility of reasonable...-
Document
Published: 25 Mar 2023