-
Moorlands. Progress reports and final report to licence full surrender, for the period 15/1/1979 to 30/11/1984.
Adelaide Brighton Cement took up tenure of the Moorlands lignite deposit during September 1976 in order to conduct confirmatory drilling of the published coal resource, to prepare a mining study for Lobe 'E', and overall, to assess the coal's...-
Document
Published: 23 Nov 1984
-
Kingston (South-East). Progress reports [until the commencement of WMC's Kingston Coal Project multi-licence joint reporting, approved from 1/5/1980] for the period 21/8/1979 to 20/2/1980.
Continuing reconnaissance and evaluation of potentially economic Tertiary or Jurassic age coal seams, both known to be present in the Naracoorte and Kingston areas, has consisted of the drilling and geophysical logging of 92 open rotary holes...-
Document
-
Sedan lignite deposit. Geological investigations and review of resources.
In October 2000 GTL Energy Pty Ltd began commercial investigations into the feasibility of establishing within Australia newly proven [coal] gas-to-liquids technology for combining power generation and synfuel production, by identifying potentially...-
Document
-
Moorlands. Progress reports and final report to licence expiry/renewal, for the period 10/9/1976 to 9/9/1978.
Work consisted of gathering all available information and advice on, and assessing the problems associated with, treatment of the Moorlands deposit low rank brown coal to make it a fuel suitable for use in cement manufacture within a newly constructed...-
Document