-
Mount Gunson - MG14 deposit metallurgy. Research reports for the period October 1974 to August 1984.
In October 1975, Mount Gunson mine operator Pacminex determined that the composition of mineable copper sulphide ore potentially obtainable from the undeveloped MG14 area would very likely be more difficult to process than existing Cattlegrid mine...-
Document
-
Hallett (part of the Nackara Gold Project). Annual reports and final report to licence expiry/full surrender, for the period 9/8/2002 to 4/10/2012.
An area of high country in the far northern Mount Lofty Ranges was taken under licence to try to find the primary source(s) of widely dispersed detrital gold known from Recent and Tertiary cover sediments in the region, while focussing mainly on...-
Document
-
RB 2004/00010 Port Pirie Treatment Plant. Management plan Phase 1 - preliminary investigation 2004
This report is Phase 1 of a management plan for the former Port Pirie Uranium Treatment Plant site, and is essentially a preliminary investigation to establish a greater understanding of the characteristics of the site. Phase 2 will follow on from...-
Document
Published: 01 Jul 2004
-
Quorn. First annual and relinquishment report for the period 8/9/98 to 7/9/99.
Newly acquired ground magnetic, mobile metal ion partial leach and conventional soil geochemical data do not support a possible kimberlite origin for an observed linear suite of small circular aeromagnetic anomalies occurring along the western margin...-
Document
Published: 20 Nov 1999
-
SADM/Amdel mineral research Project CM 1/1/184 : "Rare earths from Port Pirie tailings dams". Progress and final reports on Stages 1 and 2, for the period December 1975 to February 1977.
Tailings remaining after the crushing/acidic leach treatment of uranium-bearing davidite ore from the Radium Hill mine, which are held in six clay-lined containment ponds ('dams') at the now disused Port Pirie ore treatment plant, have been studied to...-
Document
-
Mount Gunson. Progress reports to licence expiry/renewal, for the period 1/1/1965 to 30/11/1966.
Reports detail a field examination, a history of production and exploration, a mining resumption economic assessment, and negotiations with Jervois Sulphates (NT) Ltd. Austminex commenced its involvement in mineral exploration of the Stuart Shelf...-
Document
-
Leigh Creek. Progress and annual reports to licence expiry/renewal for the period 4/3/1974 to 3/3/1976.
Ongoing exploration of abandoned historic mine workings and the surrounding area at the Mountain of Light prospect, located approximately 2 miles east of Copley, was aimed at delineating an economic copper oxide/carbonate - mineralised orebody and any...-
Document
-
SADM / Amdel Project 1/1/87 : Investigations into the future utilisation of the Port Pirie uranium plant - feasibility study on the production of magnesia from local magnesite ore. Progress and final reports for the period 20/8/1965 to 30/6/1966.
A study has been made on the feasibility of using magnesite ore mined from BHP leases in the Port Germein Gorge to produce up to 50 tons per day of high grade magnesia (MgO) using the Bicarbonate Process (ref. US Bureau of Mines, 1946) at the...-
Document
-
Yttrium oxide from Port Pirie treatment plant. Progress and final reports for the period 16/9/1966 to July 1967.
There is no abstract created for this record-
Document
Published: 01 Jan 1976