Morialpa. Data release made in lieu of submitting a first partial surrender report : progress reports and annual reports for the period 16/12/1995 to 8/8/2003.
Initial exploration for stratiform Cu-Au mineralisation hosted within Adelaidean sediments in the Morialpa area, 40 km north- west of Olary, comprised soil, stream sediment, rock chip and ironstone lag geochemical sampling, and 1:10,000 scale...-
Document
Published: 29 Aug 1903
-
Prospect Hill. Progress reports to licence expiry/full surrender, for the period 14/6/1989 to 13/6/1990.
Known fine-grained cassiterite vein mineralisation occurring at Prospect Hill was investigated via detailed geological mapping (at 1:1000 scale), ground magnetic surveying and the conduct of metallurgical testwork. Out of this work it was concluded...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Wadnaminga and Outalpa (the Olary JV Project, later renamed the Blue Rose Project). Joint annual reports for the period 19/7/2008 to 18/7/2018.
During Year 12 of the Olary JV Project (2008-2009), field work was undertaken only on EL 3849 Outalpa to make up for the earlier underspending on that licence relative to commitments. In early 2009, a ground radioactivity survey was acquired using a...-
Document
Published: 27 Nov 1918
-
Data release - as updated : Mutooroo (part of the Border Project). Annual reports [but excluding three separately held joint annual reports] and final report to licence expiry/full surrender, for the period 3/4/2007 to 18/4/2020.
During licence Year 11 (2007-2008), exploration activities on renewed EL 3745 included: • acquiring 1.9 line km of TEM profiles at Dingo prospect; • acquiring 21.4 line km of ground magnetic survey coverage at 1-metre station spacing on three...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Cutana. Annual reports for the period 25/7/2007 to 15/8/2013, and the "Curnamona South Project" annual report for the period 1/1/2017 to 31/12/2018.
During licence year 6, the commencing year of renewed EL 3895 Cutana, no work took place because Havilah's RC drilling rig, along with all company personnel, were fully occupied on completing the mining feasibility evaluation drilling programmes...-
Document
Published: 15 Apr 1919
-
Data release - as updated [made at SA Director of Mines' discretion] : Devonborough Downs (part of the Olary Project). Annual reports to licence expiry/renewal, for the period 22/10/2007 to 21/10/2012.
An area centred ~30 km south-east of Olary township is being explored for possible buried economic porphyry copper-gold deposits, as well as for any other substantial either Carlin-type, skarn-hosted, Telfer-style, or mesothermal gold mineralisation....-
Document
Published: 16 Nov 1912