-
Honeymoon Project - pilot wellfield drilling, January-March 1982.
Drilling was undertaken at the Honeymoon deposit, as allowed for under Miscellaneous Purposes Leases 14 and 15 and Retention Leases 10, 11 and 12, located within EL 597. This drilling was carried out as part of the construction of the 6 litre/second...-
Document
-
Honeymoon project - hydrological report on the HC 9 pumping test conducted February-March, 1980.
Regional and site-specific geological and hydrological factors are discussed, and a groundwater model is proposed for the Honeymoon uranium deposit, based on the results of the HC 9 drilling and testing programme, and on other existing data. A...-
Document
-
Arrowie Block, PEL 5 and 6. Progress and annual reports for the period from July 1979 to February 1989.
Exploration included : - drilling of Moorowie 1, - 1984 Hogarth - ARR, 1985 Morphett - ARR, 1986 Fletcher - ARR and 1987 Mitchell - ARR Seismic Surveys, - experimental seismic survey on Lake Frome (November 1985), - processing of 1982...-
Document
-
Beverley Uranium Project - Groundwater resources, management and monitoring.
The technical development and operational commencement stage of the Beverley in situ leach uranium mining project are herein discussed from the viewpoint of hydrogeological factors. The author summarises the uranium deposit's hydrogeological setting...-
Document
-
Lake Frome North. Progress reports to licence expiry/renewal for the period 21/10/1971 to 20/10/1972.
TARGET: Sedimentary uranium roll-front orebodies within buried Early Tertiary palaeochannels underlying the Lake Frome Plains to the south and east of the Beverley deposit. EXPLORATION: 25 rotary drillholes totalling 14,696 feet were put down to...-
Document