-
Yarramba. Progress reports to licence expiry/renewal, for the period 13/5/1971 to 12/5/1972.
Continuing intensive exploration for economic sedimentary uranium deposits within buried Tertiary palaeochannel sediments in the Yarramba Homestead area, 50 km north-west of Cockburn, which had been invigorated by the recent discovery of strongly...-
Document
-
South Eagle [part of a joint licence area with Kalabity]. Uranium exploration progress and technical reports to licence expiry/renewal, for the period 15/5/1974 to 14/2/1976.
During the EL 132 tenure, work has consisted of a mineability evaluation of the Honeymoon uranium deposit, plus additional U exploration over the South Eagle farmout. Initially, 5 rotary holes (total 594.9 m) were drilled to the north of the...-
Document
-
Preliminary evaluation of in situ leaching on MTA [Minad-Teton Australia's] uranium deposits in the Lake Frome area, SA.
In-situ leaching of a uranium orebody can only be successful if the deposit meets a number of essential criteria. These criteria are: 1. The ore occurs in a generally porous and permeable horizontal bed underlain and overlain by impermeable strata;...-
Document
-
Frome Downs. Progress reports and partial relinquishment reports to licence expiry/renewal, for the period 20/6/1978 to 14/9/1982.
153 rotary mud open holes (total 19,689 m) and 11 cored holes (total 1384 m) have been drilled during the reporting period to evaluate the Goulds Dam uranium deposit and to further explore the region to its north and south for sedimentary uranium...-
Document
-
Kalabity. Progress reports to licence expiry/renewal for the period 15/3/1971 to 17/6/1973, plus related technical reports about in situ leach uranium mining methods in Wyoming.
The recently completed drilling of 189 open rotary holes (total penetration 22,427 m), plus the redrilling and geophysical re-logging by joint venturer Minad-Teton of 19 previously completed Carpentaria Exploration Co. uranium exploration holes (for a...-
Document
Published: 02 Jan 1974
-
Mulyungarie. Progress reports to licence expiry/renewal for the period 13/5/1972 to 12/5/1973.
Ongoing exploration for possible economic sandstone-type uranium deposits formed in Tertiary palaeochannels in the Yarramba area, 50 km north-west of Cockburn, has included further open hole rotary drilling and downhole geophysical logging (176 holes...-
Document
-
Continuous solvent extraction studies.
Work carried out at Amdel and at the Colorado School of Mines' Research Institute has indicated that both a two solvent system (EHPA and TBP or DBBP) and a three solvent system (EHPA, DBBP and Alamine 336) of cationic exchangers are satisfactory for...-
Document
-
RB 84/00058 Progress report: CURDIMURKA 1:250 000 geological map - Cainozoic geology.
Two sandstone sequences, one un-named and one equivalent to the Watchie Sandstone, have been recognized on CURDIMURKA. These sandstone sequences occur beneath the Etadunna Formation. Both are believed to be equivalent to the Eyre Formation. The...-
Document
Published: 01 Sep 1984
-
RB 76/00119 Silcrete sediments and stratigraphy.
There is no abstract created for this record-
Document
Published: 01 Jan 1976
-
RB 82/00061 Late Tertiary grey billy, and the age and origin of surficial silicifications (silcrete) in South Australia.
Age demonstrated by stratigraphic relationships with palynologically dated sequences, and evidence of erosion of silcretes.-
Document
Published: 01 Jan 1982
-
RB 90/00015 Correlation and depositional environment of Tertiary strata based on macrofloras in the southern Lake Eyre Basin, South Australia.
Plant macrofossils from silicified Cainozoic fluvial sediments on CURDIMURKA occur in 2 discrete suites. One suite has been found only in outcrops of silicified Eyre Formation in the Poole Creek Palaeochannel. This suite and the macroflora of the...-
Document
Published: 01 Sep 1990
-
Regolith mapping on the Mingary 1:100,000 map area, Curnamona Province.
There is no abstract created for this record-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-26 - south-western Cooper Basin district - Tertiary sedimentary uranium mineral prospects. Project interim and final reports.
As a PACE Initiative Year 5 drilling project that was approved for part-subsidy by PIRSA, a 16,777 m shallow rotary mud drilling programme was undertaken during the period August to November 2008 within five of the Sturt Joint Venture exploration...-
Document
Published: 31 Jan 1909
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-09, Yarramba Palaeochannel uranium mineral prospects. Project final report.
A PACE Initiative Year 3 subsidised drilling programme has been undertaken by the EL 3482 licensees over part of the Yarramba Palaeochannel north of the Honeymoon U deposit, seeking similar, Tertiary sediment-hosted roll-front uranium deposits in an...-
Document
-
Beverley Uranium Project - Environmental Impact Statement, June 1998, and related reports.
There is no abstract created for this record-
Document
-
SADM/Amdel Project MP 1/1/172: In situ leaching of uranium (Honeymoon deposit, Frome Embayment). [Results of analytical, mineralogical and metallurgical testwork performed on diamond drill core samples]. Progress reports 1-6, May 1975 to November 1976.
At the request of Mines Administration and of the South Australian Mines Department, Amdel has undertaken a project designed to obtain data on the in situ leaching potential of the uranium ore in the Honeymoon deposit, located in the Lake Frome region...-
Document
Published: 05 Nov 1976
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-18, Glencoe (Lake Frome East) area roll-front style uranium mineral prospects. Project interim and final reports.
The subject EL 3391 is located in the eastern Lake Frome region, and is prospective for roll-front type uranium mineralisation emplaced within sediments of the Tertiary Lake Eyre Basin. In December 2006, as part of the PACE Initiative Year 3...-
Document
Published: 02 Mar 1907
-
Mundaerno South. Annual reports plus final report to licence expiry/full surrender, for the period 23/7/2007 to 22/7/2014.
A small area centred ~33 km north-west of Cockburn and ~26 km south-southeast of the Honeymoon deposit has been explored for possible buried, calcrete hosted secondary uranium deposits that may have formed in Quaternary valley fill sediments, and also...-
Document
Published: 20 Feb 1914
-
Lake Arthur East, Lake Arthur West and Lake Arthur (the Lake Surprise Project and the Mumpie Project). Data release made in lieu of submitting partial surrender reports : annual and joint annual reports for the period 29/8/2006 to 28/8/2014.
A wide basinal area located east of Marree and bordering the northern Willouran Ranges is being explored afresh for sedimentary uranium occurrences in response to market conditions and the demonstrated prospectivity of the local cover rocks, which...-
Document
Published: 30 Oct 1914
-
Yarramba. Annual reports submitted until the commencement of licences' joint reporting on the South Eagle / Honeymoon Project, for the period 10/4/2000 to 26/8/2009. [ Index Part 1 of 2 ].
Southern Cross Resources Australia Pty Ltd (Southern Cross) purchased Rio Tinto Exploration Limited’s share of the Northern Olary Joint Venture, including its interest in the subject EL 2310 Yarramba, in November 2000. Southern Cross has held the...-
Document