-
Point Paterson - Port Pirie area. Progress reports on work carried out prior to grant of a special mining lease, for the period June 1962 to November 1969.
The applicant proposes during the two year SML period to undertake a work and study programme to determine the economic feasibility of developing a seawater salt recovery complex on the areas applied for, which will be capable upon completion of the...-
Document
Published: 07 Nov 1969
-
Lake Torrens. Progress reports to licence expiry/renewal for the period 13/4/1973 to 12/4/1975.
Continuing exploration by Delhi of the industrial salt potential of subsurface brines in the Lake Torrens basin aimed to ascertain the potential reserves of NaCl in the southern part of the lake, and to confirm the availability of suitable brine...-
Document
-
Point Paterson - Port Pirie area. Progress, technical and final reports for the period 22/1/1970 to 10/12/1971.
Reports on the investigation of potential northern Spencer Gulf coastal sites for the solar evaporative production of seawater salt, principally as a feedstock for the proposed petrochemical plant which was being considered by Dow Chemical Corp. for...-
Document
Published: 10 Dec 1971
-
RB 73/00094 Construction materials of the Adelaide area - Production, restraints and resources.
Analysis of present production and estimated future requirements shows that available reserves in existing quarry areas will be depleted around the year 2010. Ownership of mineral deposits does not bestow statutory rights for working and legislative...-
Document
Published: 01 Jan 1975