-
RB 81/00067 Mineral resources of the Calperum land management area, County Hamley - Department of Lands.
Sources of hard rock are restricted. Deposits of limestone and silicified sandstone are significant because of their proximity to Renmark and Berri. The present competition for these resources should be resolved by reserving an appropriate area from...-
Document
Published: 01 Nov 1981
-
Three Creeks area (part of the Hawker Project). Annual and final reports to licence expiry/full surrender for the period 5/6/2006 to 4/6/2010.
The Three Creeks EL 3567 covers, for the most part, the north-westerly plunging Yednalue Syncline. Lying to the south-east of the Worumba Anticline (a diapiric structure cored by disrupted Callanna Group), the syncline comprises Umberatana Group...-
Document
Published: 17 Sep 1910
-
Hawker. Final report at licence expiry/full surrender for the period 2/7/2007 to 1/7/2009.
Copper Range has targeted several different styles of base metal mineralisation within the Chace Range district. Initially its focus was on sediment (sandstone)- hosted copper deposits, with exploration being confined to reconnaissance field visits to...-
Document
Published: 22 Jun 1909
-
Data release - as updated [made at SA Director of Mines' discretion] : Wild Horse Plain. Annual reports for the period 8/7/2005 to 23/2/2019, plus partial surrender reports to 23/2/2021.
An upland area located approximately 100 km south-west of Whyalla on the eastern Eyre Peninsula, and with its eastern boundary running parallel to the coast at a distance of 15 km from Cowell and Franklin Harbour, is being explored for uranium,...-
Document
Published: 11 Jan 1921
-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-06 - Intercept Hill, Stuart Shelf, Mesoproterozoic IOCGU mineral prospects. Drilling project final report.
EL 5372 Intercept Hill is centrally located in the world class Olympic Dam Iron Oxide Cu-Au-U Province, at the centre of a cluster of iron oxide copper occurrences including Emmie Bluff, Oak Dam and Winjabbie. The Intercept Hill area has available...-
Document
Published: 19 Jan 1916
-
RB 2010/00019 Hardrock extractive minerals for metropolitan Adelaide - strategic review. [Summary version]
The purpose of the project is to provide essential data on the hardrock extractive (construction material) resources supplying the Adelaide metropolitan area, in order to be able to: - Critically examine current hardrock supplies and resources and how...-
Document
Published: 01 Oct 2010
-
RB 74/00108 Construction materials resources, Redcliff Project. General appraisal and recommendations for further investigations, County Frome.
There is no abstract created for this record-
Document
Published: 01 Jan 1974
-
Mount Kingston East Areas 1 and 2, and Mount Harvey (the Denison Range Project). Joint annual reports to licences' expiry/full surrender, for the period 13/12/2010 to 12/6/2013.
The three Denison Range Project tenements, centred approximately 70 km south-east of Oodnadatta, which cover alluvial plains formed adjacent to the south-eastern edge of said range of hills that comprise eroding Palaeo- to Mid-Proterozoic uranium-rich...-
Document
Published: 22 Jul 1913
-
Drennan's Hut (part of the Curnamona Project). First partial surrender report for the period 8/12/2010 to 12/6/2013.
EL 4623 licensee AREVA, as part of its Curnamona Project comprising eight tenements, has been exploring the Callabonna Sub-basin since 2004 for possible economic deposits of buried sedimentary uranium mineralisation that may have formed within...-
Document
Published: 12 Aug 1913
-
Mount Craig (part of the Hawker Project). Annual and final reports to licence expiry/full surrender for the period 15/11/2005 to 14/11/2010.
Copper Range's principal exploration targets in the Adelaide Fold Belt are secondary, near-surface oxide copper deposits that are structurally controlled and related to hydrothermal events focussed along faults late in the deformational history of the...-
Document
Published: 06 Apr 1911
-
Data release [made at SA Director of Mines’ discretion] : Ooldea. Progress and technical reports to licence expiry/renewal, for the period 6/12/1989 to 5/1/2000.
An occurrence of primary magnetite mineralisation within buried Archaean magnetic basement, first inferred from a strong northeast-trending linear magnetic anomaly observed at a location 20 km south of Ooldea Siding at the northern edge of the...-
Document
Published: 16 Nov 1999
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-49, Bird-In-Hand Mine Deeps Project gold mineral prospects. Project final report.
At the historic Bird-In-Hand mining claim, where previous mine exploration drilling beneath the old workings by current licence operator Maximus Resources had delineated an inferred remaining gold resource of 53,000 ounces over the depth extent from...-
Document
-
Talisker prospect. Progress reports to licence expiry for the period 21/4/1969 to 20/4/1970.
IP and resistivity surveys, 1:200 scale geological mapping, and soil and rock chip sampling were carried out over exploration grids covering bleached metasedimentary outcrops that might indicate possible buried lode extensions in the vicinity of the...-
Document
-
Oodnadatta. Combined first progress / final report to licence surrender for the period 22/6/1972 to 28/1/1973.
Reconnaissance prospecting, plus close inspections and sampling of historically briefly worked auriferous areas in the basal Mesozoic sediments on the banks of the Neales River, suggest that any reserves and grades present there would be insufficient...-
Document
Published: 08 Nov 1972